Uncemented Liner Completion in an Unconventional Fractured Reservoir Eliminates Formation Damage and Improves Productivity-Field Case Study on Exploratory Well

Author:

Al-Ibrahim Abdullah1,Al-Bader Haifa1,Duggirala Vidya Sagar1,Ayyavoo Mani Maran1,Subban Packirisamy1,Almulla Sulaiman1

Affiliation:

1. Kuwait oil Company

Abstract

Abstract Objective/Scope The objective is to achieve improved productivity from an unconventional fractured reservoir using uncemented liner completion over the standard cemented liner completion. Method, Procedures, Process Exploration and production of an unconventional fractured Najmah & Sargelu (NJSR) reservoir in Jurassic section has been a challenging task due to the presence of challenging reservoir quality like tight fractured limestone, very low matrix porosity, uncertainty on natural fractures, high stress, etc. NJSR reservoirs are considered as a secondary target. As the deeper primary reservoir needs to be evaluated, testing of NJSR reservoir takes considerable time after drilling which lead to permanent plugging of NJSR fracture network by invaded oil based mud (OBM). Mixed success has been observed on sustainable production from NJSR exploration wells. Production from fractured reservoir relies primarily on intersecting interconnected natural fractures, optimal drilling and special completion technique. Protecting the natural fractures present in NJSR reservoir can increase the reservoir contact and production. A study conducted on this reservoir suggested to target only NJSR formation and install uncemented liner to eliminate the damage caused by cement invasion and achieve sustainable production. The study also emphasized to activate the well as soon as possible after completion to revive fracture conductivity. Uncemented perforated liner completion method has been selected for field trail in an exploratory well to maintain borehole integrity and control production of solids, connecting open fractures, increase inflow area and enhance production. The case study well targeting NJSR reservoir was drilled upto 14,925ft and 5" uncemented CRA liner was installed against reservoir section. The well was completed with permanent packer using 3-1/2" production tubing. Well fluid was displaced with diesel, mud clean solvent was spotted inside 5" production liner and the uncemented liner section was perforated using wire line guns in underbalanced condition. The well became active after perforation and flowed naturally oil and gas with 1.8% H2S. Results, Observations, Conclusions A successful implementation of uncemented liner completion technique in an exploratory well for the first time proved to be effective in fractured reservoir compared to the conventional cemented liner completion. Application of uncemented liner completion technique has preserved fracture connectivity, eliminated formation damage due to cement invasion and reduced time and cost of cementing and stimulation. During initial testing the first field trial well has produced oil and gas without stimulation, which is a success compared to conventional method. As a final recommendation from the study, future exploratory wells targeting NJSR reservoir will be drilled in high angle trajectory and completed using uncemented slotted liner with swell packers to improve the productivity. Novel/Additive Information This paper will discuss in details on new completion strategy, testing of deep HPHT well and performance of first exploratory well completed with uncemented liner.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3