Abstract The challenges of high heterogeneous multi-layer reservoirs were a driver for ADNOC to establish new well completion requirements. Based on this, the well completion strategy was revised in order to improve the completion design for a Dual Oil Producer (DOP) initially well planned without accessibility into the upper drain. The solution was successfully implemented by drilling the well having a Multilateral Dual String Level 5 Completion System to have full reservoir isolation and mechanical accessibility to TD in both drains. A major approach was implemented giving the utmost importance to all operational risks concerning drilling and completion. The design relies on the Latch Coupling (LC) pre-installed with the production casing as the foundation for the successful drilling and cementing the upper drain liner and for different completion runs. Thus, a level 5 multi-lateral completion coupled with Inflow Control Devices and Pre-perforated Liner in the upper and lower lateral respectively was successfully deployed. The main advantages of this technology compared to the initial proposal are: Brings effectively two single wells from one slot of the wellhead tower as it provides independent access & control for enhanced reservoir management (well stimulation, production logging and water shut-off). Substantial cost savings due to the utilization of one slot only. Conventional single designs need two slots to deliver equivalent completion requirements. The completion technology meets the Well Integrity Policy & Completion Guidelines stated by ADNOC to have full accessibility to all drains. This is the first Level 5 configuration installed in UAE integrated with a lower completion. The design enhances the benefits of the multilateral construction by providing full mechanical & pressure isolation at the junction throughout the life of the well. Furthermore, accessibility to both laterals from surface without the use of a re-entry deflector or any constraints was deemed to be paramount for a successful well construction.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3