The challenges of high heterogeneous multi-layer reservoirs were a driver for ADNOC to establish new well completion requirements. Based on this, the well completion strategy was revised in order to improve the completion design for a Dual Oil Producer (DOP) initially well planned without accessibility into the upper drain. The solution was successfully implemented by drilling the well having a Multilateral Dual String Level 5 Completion System to have full reservoir isolation and mechanical accessibility to TD in both drains.
A major approach was implemented giving the utmost importance to all operational risks concerning drilling and completion. The design relies on the Latch Coupling (LC) pre-installed with the production casing as the foundation for the successful drilling and cementing the upper drain liner and for different completion runs. Thus, a level 5 multi-lateral completion coupled with Inflow Control Devices and Pre-perforated Liner in the upper and lower lateral respectively was successfully deployed.
The main advantages of this technology compared to the initial proposal are:
Brings effectively two single wells from one slot of the wellhead tower as it provides independent access & control for enhanced reservoir management (well stimulation, production logging and water shut-off). Substantial cost savings due to the utilization of one slot only. Conventional single designs need two slots to deliver equivalent completion requirements. The completion technology meets the Well Integrity Policy & Completion Guidelines stated by ADNOC to have full accessibility to all drains.
This is the first Level 5 configuration installed in UAE integrated with a lower completion. The design enhances the benefits of the multilateral construction by providing full mechanical & pressure isolation at the junction throughout the life of the well. Furthermore, accessibility to both laterals from surface without the use of a re-entry deflector or any constraints was deemed to be paramount for a successful well construction.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献