1. SPE-180055-MS Use of Specially Treated Micronized Barite Fluid System with Wellbore Strengthening Approach to Drill Extremely Depleted Reservoir - HPHT Kvitebjørn Field, Offshore Norway;Ay,2016
2. SPE-191331-MS Drilling a Challenging Kvitebjørn Field 5-3/4-in. Section in a Single Run Using a New Mud Motor Modeling Engineering Workflow and New Long-Life Elastomer;Beeh,2018
3. Drilling and Completing High-Angle Wells in High-Density, Cesium Formate Brine - The Kvitebjørn Experience, 2004-2006;Berg;March 2009 SPE Drilling & Completion,2009
4. Bjørkevoll, Knut S., DagOve Molde, RolvRommetveit, and SveinSyltøy. 2008. "IADC/SPE 112739 MPD Operation Solved Drilling Challenges in Severely Depleted HPHT Reservoir." 2208 IADC/SPE Drilling Conference. Orlando, Florida, USA: IADC/SPE. 12.
5. SPE-199286-MS Profiling the Production Performance of Five HPHT Gas Condensate Wells Drilled and Completed with High-Density Cesium Formate Fluids in Brent Group Formations of the Kvitebjørn Field;Downs,2020