Abstract
Abstract
ADNOC Onshore initiated a pilot implementation of Under Balanced Coiled Tubing Drilling technologies for Gas Reservoirs with this being the first time in the ADNOC Group of Companies. Detailed planning was carried out for this project implementation and the onward optimization for the 3rd well based on lessons learnt was carried out.
This 3 well pilot Underbalanced Coiled Tubing Drilling, UBCTD, pilot campaign involves the sidetracking from a pre-drilled 6" hole and then drilling 3-¾" laterals with the laterals drilled in a carbonate gas reservoir utilizing UBCTD technology and methods with these being applied to eliminate formation damage, enhance production, and improve drilling performance.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献