Abstract K field is a faulted anticline structure lying in a turbidite environmental setting, which consists of two main sand bodies of 50-100ft gross thickness. Two main challenges during development stages were, 1). The narrow thickness of the fault block requiring accurate landing, well placement and characterization. 2). The low vertical permeability inside the sand which requires the straddling and precision of horizontal placement relative to reservoir boundary. Geosteering was proposed to mitigate those challenges, which is then translated into a directional drilling plan. Hybrid LWD combination of Seismic, Reservoir Mapping, RT-Image and Formation Pressure While Drilling technology were used overcome those objectives and challenges. Seismic was used to update target uncertainty in both depth and lateral coordinates, hence accurate landing inside the target fault block was the main driver. Reservoir Mapping Technology and borehole images were used to update the presence of fault and plan for an accurate placement of the horizontal section. Pressure While Drilling was used to update the reservoir pressure and fault/ connectivity between fault/compartments. Post job subsurface modeling was updated using those measurement for accurate interpretation, which was used for future field development plan. The drilling workflow was extensively discussed among the stakeholders to make sure it was fit for purpose and could achieve the objectives. Horizontal well landing procedures using Seismic While Drilling technology helped the well penetrate into fault block A at 100m before fault edge. Reservoir Mapping While Drilling technology enabled successful Geosteering inside the desired target zone. Another important application regarding the Reservoir Mapping Technology is the capability of resolving the internal sedimentary bedding feature (higher dip feature) and the delineating of multiple faults including sub seismic fault block B, which helped the team define well TD at the desired fault block position. An integrated interpretation between Reservoir Mapping While Drilling, High Resolution Images and Formation Pressure While Drilling to detect pressure continuity between one block to the other proved to be very helpful for production management and completion optimization. At the end, two horizontal wells were successfully drilled in the desired fault block. Everything worked, ie the technology, the people and the process, resulting in an accurate and well controlled execution of a complex and high-profile project. The novel approach was successfully demonstrated to ensure well objectives are achieved in an integrated manner. The flawless execution allowed the team to avpid drilling any side tracks which would have been costly.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3