Abstract
Robert C. Burton and Stuart A. Boggan, Conoco
Abstract
This paper provides a review of sand control completion design, installation and subsequent well performance in the Jupiter Field.
The paper reviews formation failure predictions used to assess the need for sand control and discusses the completion designs selected to prevent sand production in a series of high rate gas wells. Completion installation, consisting of running pre-packed screens into the drilled hole, wellbore clean-up and initial well testing is also discussed.
A review of long term sand control effectiveness and completion pressure loss data for these wells is also presented.
P. 149
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献