Abstract
Abstract
In the paper, we document one iteration of the continuous improvement of well performance undertaken in the Oriente Basin in Ecuador. In the past, it had been observed that well economics was sometimes degraded by the issues related to proppant flowback from hydraulic fractures. Proppant flowback resulted in extra costs from well cleanouts, pump replacement, and damage to fracture conductivity. After evaluation of proppant flowback cases using the combined modeling workflow that simulates fracture growth, proppant placement, and early production of solids and fluids, it had been proposed to modify fracture designs and well startup strategy. In this paper, we review the first results of implementation of these modifications in the field and evaluate the significance of improvements.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献