A Case History of the Pegasus Ellenburger Reservoir

Author:

Cargile Leslie L.1

Affiliation:

1. Mobil Oil Corp.

Abstract

The performance of the 13,000-ft-deep Pegasus Ellenburger in West Texas has shown that, even in an extremely heterogeneous reservoir, gravity segregation drive can be an efficient producing mechanism. Introduction The Pegasus field is a large multizone field in Midland and Upton Counties, Tex. Oil productive intervals have been found in the San Andres, Spraberry, Pennsylvanian, Devonian, Fusselman and Ellenburger zones. The Pegasus Ellenburger is the deepest reservoir at an average depth of 13,000 ft and is also the most prolific oil producer. Since discovery in 1949, over 60 million STB of oil have been produced from this reservoir. The 4.5 million STB produced in 1967 was the highest annual oil production during the life of the reservoir. As production during the life of the reservoir. As of April, 1968, the reservoir pressure was more than 1,100 psi below the bubble point and the producing GOR had not significantly increased. producing GOR had not significantly increased. Development and Unitization Magnolia Petroleum Co. (now Mobil Oil Corp.) drilled and completed TXL "A" Well No. 1 as the discovery well in the Pegasus Ellenburger field. This well, which is now the Pegasus Ellenburger Unit Well No. 15-1, was drilled in March, 1949, to a total depth of 13,295 ft, with a potential of 1,167 BOPD flowing with over 1,000 psig tubing pressure. From 1950 to mid-1954 the field was pressure. From 1950 to mid-1954 the field was developed at an average rate of 24 wells/year. In all, 119 wells have been drilled. The Pegasus Ellenburger unit became effective June 1, 1954. Fig. 1 shows the location of wells and the unit boundary. Production and Injection History Production and Injection History Fig. 2 shows the oil and water production history, water and gas injection history, and GOR performance. The sharp decrease in oil production in 1951 resulted when the allowable was reduced from 395 to 200 B/D/well to allow time to initiate pressure maintenance operations before the bubble-point pressure was reached. Pilot water injection was begun in 1955 and expanded in 1959 to a full-scale peripheral injection program. In 1960 the allowable was increased to 435 B/D/well (the 1947 yardstick value for 80-acre spacing). Water injection performance did not prove efficient and, in performance did not prove efficient and, in 1963, injection rates were curtained so that the effects of continued pressure decline could be observed. Gas injection was begun in 1967 and expanded to a full-scale crestal gas injection program in early 1968. Geology Structurally, the Pegasus Ellenburger reservoir is a three-domed anticline with a general northeast-south-west axial trend. (See Fig. 3.) The production area encloses almost 10,000 acres. There are major faults along the east and west sides of the field, and it is believed that numerous other faults (having smaller displacements) also exist throughout the field. JPT P. 1330

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3