Agile Field Development Planning: A Systems Approach

Author:

Ciccarelli John1,McLachlan Duncan1,Singh Himadri1,Thomson Rob1

Affiliation:

1. io oil & gas consulting

Abstract

Abstract It can take months, perhaps a year or two, to get through Front End Loading (FEL) stages with the current industry approaches. As the industry strives to be more efficient, faster to market in this lower for longer world, we need a different and much faster, lower risk approach that does not erode value. Multiple tools exist that allow subsurface/surface simulation integration and coupling, but these are cumbersome to configure and not appropriate for an early field development at the stage of pre-FEED (Front End Engineering and Design). To meet this challenge, an agile approach to Field Development Planning (FDP) has been established. The approach is inspired by agile project management techniques and best practices that are currently used in the automotive, aerospace, construction, software development industries and lean start-ups. It is based on parallel sprints rather than the waterfall approaches to project management. Collaborative teams work on parallel deliverables to create a minimum viable product (MVP) and value drivers for further development are established quantifiably with an Analytic Hierarchy Process (AHP). The notion of a fully representative dynamic techno-economic model is presented. This model applies a multi-dependent system thinking approach, with dynamic integration of economic, reservoir, subsea, facilities and schedule data. Two case studies are discussed where this approach was used to maximise economic benefits of the asset and accelerate the decision-making process during FEL stages: Identification of the best compression solution to optimise the economic outcome of production from a complex group of 350 wells intersecting different reservoirs. The result of this example was an 18-month acceleration of the decision process and 30% cost saving.Deciding whether the FEED should be oriented towards simultaneous or sequential production for the development of two marginal offshore satellite fields. This presentation will be of interest to anyone looking to speed up the time to first oil/gas and reduce production costs on undeveloped or underdeveloped fields and bid more confidently on assets during licence rounds with less risk. It will also be of interest to those wanting to accelerate their decision-making process during FEL stages from months or years to weeks and allow decision makers to visualise and test inter-dependencies creatively with less cognitive bias.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3