Unconventional Bradenhead Cementing in the Delaware Basin – Case History

Author:

Pelton Ben1,Adam Derek1,Granier Garrett1,Turner William1,Tellez Muradas Diego1,Willis John1

Affiliation:

1. Occidental Petroleum Corp.

Abstract

Abstract This Delaware Basin case history describes a bradenhead cementing method that improves zonal isolation and top of cement (TOC). Common solutions for cementing depleted formations include stage tools, low-density slurries and reverse circulation. For this bradenhead method, cement is pumped through the wellhead valves and down the annulus to a target loss zone. Field data, lab data and the engineering model support the improvement bradenhead cementing provides across depleted formations. The depleted Brushy Canyon formation serves as an injection interval for a two-stage bradenhead cement job. This approach isolates formations below the Brushy Canyon with a conventional first stage, while achieving TOC with the second stage pumped down the annulus. Fracture gradients of the injection interval and casing shoe constrain the cement design. To achieve adequate cement placement, the design phase includes the pressure calculations required to initiate flow and injection for the bradenhead stage. Reactive spacers are utilized to prevent annulus fluid level drop in extreme cases. A benchmarked cement bond log (CBL) quantifies the results and validates this unconventional cementing method. More than 50 two-stage bradenhead cement jobs were executed with a TOC success rate of 100% in intermediate and production hole applications. CBL data obtained after cementing the intermediate casing confirms the two-stage bradenhead as a placement method. In areas constrained by casing shoe pressures, CBL data identified potential areas of shallow injection. These data resulted in a modification of the fluids pumped. Use of these re-engineered fluids reduced injection initiation pressures and improved cement bonding across salt and anhydrite formations. Cementing costs were reduced by eliminating stage tools, annular casing packers, and low-density cement slurries. Pumping the bradenhead job offline (off the rig's critical path) reduces cost further. These features support bradenhead cementing as an effective solution for wellbore sections with a potential injection zone. The regulatory requirement to place cement above depleted formations resulted in many innovative cementing methods. Stage tools, low-density slurries, and reverse circulation are attempts to avoid formation breakdown, but these methods increase cost and have limited reliability and integrity. Bradenhead cementing takes advantage of the depleted interval to aid in cement placement. Although counterintuitive, bradenhead cementing has proved to be a cost-effective solution that improves zonal isolation and eliminates integrity risks associated with stage tool failures.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3