Steam Injection Pressure and the SAGD Ramp-Up Process

Author:

Li P.1,Chan M.1,Froehlich W.1

Affiliation:

1. Petro-Canada

Abstract

Abstract Most SAGD projects require about one to two years for ramp-up. Over this period of time, oil rate will be below peak oil rate and SOR will be higher than long-term steady-state SOR. This paper discusses the effect of steam injection pressure on SAGD ramp-up time, the associated geomechanical effects and optimization of the ramp-up phase of SAGD. Different steam injection pressures induce different reservoir geomechanical behaviour in oil sands. Higher steam injection pressure is capable of inducing more favourable reservoir geomechanical effects (such as shear dilation and isotropic unloading), improving the reservoir permeability, and subsequently, benefiting the long-term SAGD operation. This paper indicates that the ramp-up time can be reduced due to the favourable geomechanical effects. A coupled reservoir geomechanical simulation technique was applied for this investigation. In addition, cap rock integrity concerns when applying high injection pressure are also addressed. It is recommended that during or following the ramp-up phase, the injection pressure be lowered to a safe operating pressure to ensure cap rock integrity. The effects of low and high steam chamber pressures on SAGD oil rate are also discussed. Introduction The steam-assisted gravity drainage (SAGD) process has been proven to be the most promising technology for developing the Athabasca oil sands reserves in northern Alberta. In 2001, only four commercial SAGD projects were operating in the field(1). By March 2006, the number of active SAGD projects increased to 15(2). Field SAGD operation experiences and numerical simulation show that the steam injection pressure plays an important role in SAGD production performance. In general, higher steam injection pressure helps lift fluid from downhole to the surface, increases the oil production rate, reduces the overall well life and improves the ultimate oil recovery. Some of these enhancements could result from geomechanical effects induced by higher steam chamber pressure. For the unconsolidated oil sands reservoir under certain in situ stress conditions, higher steam injection pressure tends to induce larger volumetric strain associated with shear dilation, thermal expansion, and even, tensile failure. As a result, reservoir permeability can be improved and oil recovery will be accelerated. Higher steam injection pressure, however, can also have undesirable effects. It may cause the reservoir cap rock to be breached due to geomechanical behaviour, and then result in a very high steam-oil ratio (SOR). Therefore, the time for applying high steam injection pressure needs to be optimized for maximum geomechanical benefits without causing cap rock failure. From the beginning of steam injection to the time when the partially drained zone approaches the cap rock, higher injection pressure may be safely applied. This strategy will accelerate the oil production rate for the ramp-up phase and will attain the peak SAGD oil rate sooner than otherwise possible. This paper applies a coupled reservoir geomechanical simulation (called "coupled simulation") technique(3) to investigate the relationship between the steam injection pressure and the SAGD ramp-up process.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology,General Chemical Engineering

Cited by 22 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3