Abstract
Abstract
BP has developed a range of innovative techniques to maximize economic oil recovery from its global miscible gas floods and the results have been reported in a series of publications over the past three decades. The purpose of this paper is to provide an overview of BP's experience of establishing, managing and optimizing a miscible gas flood.
Prudhoe Bay (Alaska) is the world's largest miscible gas project. Conventional and unconventional methods have been applied in a variety of different settings. An extensive surveillance program has facilitated a good understanding of the processes operating at field scale and surveillance data are used to optimize the flood. In 2000, a large-scale gas cap water injection project was implemented to slow the decline in field pressure. This project has made the vaporization process more efficient at higher pressure, resulting in additional recovery. Miscible gas injection has been extended to numerous other fields on the North Slope of Alaska.
BP has two active miscible gas projects in the North Sea: Magnus and Ula. Tertiary miscible water-alternating-gas (WAG) flooding in Magnus field started in 2002 and its impact on reservoir performance is significant and well understood. Tertiary miscible WAG injection in Ula field started in 1998 and has played a key role in arresting production decline. The WAG scheme in Ula is currently being expanded. In addition to these projects, BP operates a CO2 injection and storage project at In Salah, Algeria, where more than 3.2 million tonnes of CO2 have been stored since 2004.
Miscible gas injection has generated considerable benefits for BP over the past three decades and will continue to do so. The potential availability of large sources of CO2 in the future, supplied by carbon capture, could help maintain a leading role for miscible gas injection for years to come.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献