Guidelines to Successful Dewatering of CBM Wells

Author:

Bassett Lonnie1

Affiliation:

1. Weatherford

Abstract

Introduction Pumping water from a well is a straight forward effort that has been done for centuries. Pumping fluid from relatively shallow wells should be an easy task. Normally a pump is installed in a well, started and then forgotten. This premise does not hold true in CBM wells. In CBM wells, this pumping process can be complicated by many issues unless precautions are taken. This paper is designed to address the basic precautions that can be taken to improve de-watering of CBM wells. These precautionary steps can save the operator money by reducing the month to month maintenance associated with CBM wells. Although we cannot cover every potential pitfall to de-watering operation, the basic steps discussed will identify potential problems and offer ideas to address them. Well Planning for Artificial Lift The successful de-watering of CBM wells, especially Coal Bed Methane (CBM) wells takes some planning before the first well is dilled. Many factors should be taken into consideration so that the operation can be economical for the entire life of the well. Unconventional gas has gone from an experiment to a logical and viable energy source. Pre-planning can and will reduce the overall cost of operation over the life of a CBM well. Short cutting the pre-planning stage can often take perceived savings in well drilling costs and transfer these costs to much higher day to day maintenance costs and lower gas production, thus decreasing the economics of the play. The learning curve has been steep for operators and suppliers as well as we all try to find solutions to the many challenges that face the industry. The first step is to identify the type of coals to be de-watered by asking these questions. Are the cleats in the coals easily fractured? How thick are the coals? Do the coals contain sand, clay or other solids that could interfere with pump operations? Are their multiple coal zones and what kind of material separates the zones? Are their other CBM wells producing from the same formations and what problems have they encountered? Pre-planning will reap benefits in lower operating costs and maintenance and higher profitability for the operator.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3