Radioactive Depth Marker Emplacement and Survey for Early Subsurface Geomechanical Model Calibration: Learnings from a Successful Ultra-HPHT Deployment

Author:

Banks John1,Tourny David2,Shotton Peter1,Sampson Tim2

Affiliation:

1. Total E&P UK, Ltd.

2. Baker Hughes, Ltd.

Abstract

Summary Ultra-high-pressure high-temperature (uHPHT) reservoirs undergo extreme pressure depletion during their production life cycle. This results in significant reservoir compaction and consequent overburden subsidence with major consequences for wellbore mechanical integrity, safety, and field economics. However, the use of underdetermined geomechanical models to accurately predict compaction-induced stress/strain changes on wellbores and its consequences during production time results in significant residual uncertainty. One method of measuring compaction-induced stress/strain changes in wellbore is by the emplacement and measurement of radioactive markers. Although it is long established in normal pressure reservoirs, it is rare in uHPHT projects. The Culzean uHPHT gas-condensate field is located in the UK Central North Sea. To constrain geomechanical model compaction uncertainty, radioactive markers were deployed. The objective was to accurately acquire preproduction baseline measurements and subsequent changes through periodic measurements during production life. These accurate wellbore measurements would then be compared with the geomechanical model to help calibrate predicted to actual compaction. By doing so, the objective is to enable better informed decisions regarding well and field management. The Culzean uHPHT radioactive marker project comprised a planning phase and a preproduction safe deployment including a baseline survey phase. Subsequent repeat measurements are planned during field production life. The emplacement and surveying of the subsurface radioactive markers for compaction monitoring in uHPHT reservoirs is a high value but nontrivial operation. In addition, much knowledge and experience of the methodology has been lost. This paper contributes to published literature by describing the successful emplacement and monitoring of subsurface radioactive markers on Culzean and aims to capture learnings and knowledge for future workers. Early detailed planning coupled with extensive testing is key to successful deployment. Timely engagement of all stakeholders and ensuring all decisions are aligned with safety and environmental considerations also contribute to realization of the project aims.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3