Degradable Alternative to Risky Mill-Out Operations in Plug and Perf

Author:

Aviles I..1,Dardis M1,Jacob G..1

Affiliation:

1. Schlumberger

Abstract

Abstract With hundreds of thousands of well stages completed in 2014, the “plug and perf” technique is the number one stimulation method used in unconventional reservoirs. This technique relies on the use of metal or composite plugs to isolate sections of the reservoir to be hydraulically fractured. After all the stimulation operations are complete, plug removal is required to enable production to begin. A motor and a mill assembly must be conveyed into the well, usually by coiled tubing, to eliminate the plugs used during the stimulation. In wells with low reservoir pressure or long horizontal sections, plug mill-out can prove very challenging. Returns do not easily reach the surface, and fluid is often lost into the recently created fractures. Even with the use of nitrogen to assist with cleaning operations, debris from the plugs removed can accumulate in the horizontal section, posing a risk of getting the coiled tubing stuck during the operation. In addition to this significant risk, the economic impact of such operations increases under these conditions because operations tend to be lengthier and more complex than traditional plug mill-outs. A new plug-and-perf technology has been developed to address the problems mentioned above. This method relies on degradable technology to eliminate the need to remove plugs. During fracturing, this new technology follows the same process as traditional plug and perf, but no plug removal is required after stimulation. Seat assemblies serve the function of plugs, and after all stages are completed, these seats remove themselves by simple contact with flowback water. Immediate production is possible, and the well is left with a fullbore ID. No restrictions are left in the well that would prove problematic during any future workover intervention. This restriction-free environment also allows for the full production potential of the well to be achieved, as no chokes to production are left in the well. The operational sequence of the new fully degradable isolation assembly for plug and perforate technique have shown a seamsless integration into current best practices for Eagleford operatiors, where the technology has been applied.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3