Field Experience Utilizing High-Density Brines as Completion Fluids

Author:

Spies R.J.1,Himmatramka A.K.1,Smith J.R.1,Thomas D.C.1

Affiliation:

1. Amoco Production Co.

Abstract

Summary This paper presents the results of 2- years experience using high-density brines as completion fluids in fields offshore Texas. This experience has resulted in a number of improvements in field methods of handling and using these fluids in making gravel-packed completions in abnormally pressured wells. Because the required fluid densities have been in the range of 15.0 to 15.6 Ibm/gal (1797 to 1869 kg/m ) and the fluids have cost several hundred dollars per barrel, the cost of lost or contaminated fluid has been a significant factor in carrying out these completions. We have developed our current completion methods in an effort to minimize fluid costs, maintain well control, maximize productivity, and minimize rig time per completion. The methods developed include those for perforation cleaning, gravel packing, solids removal, density control, control of fluid losses, and prevention of crystallization. The results of these methods generally have been successful in controlling completion costs and apparently are successful in providing good sand control and adequate flow efficiencies on the basis of initial test results for about two-thirds of the wells. Introduction Amoco Production Co., as operator for a group consisting of Mobil Oil Corp., Union Oil Co. of California, and Amoco, acquired three adjoining Outer Continental Shelf leases in the May 1974 federal offshore lease sale in what would become the High Island Block A-537 field, The field has been the primary location where we have used high-density brines. This paper describes the basis for using heavy brines in these completions, the plans developed for the completions, our experience in performing them, the resultant evolution of our procedures, and the achieved well productivities, which have confirmed the advantage of using a solids-free completion fluid. The field is located approximately 85 miles (137 km) south-southeast of Galveston, TX, in water depths of 190 to 200 ft (58 to 61 m) in the Gulf of Mexico. Exploratory drilling began in 1974, and a total of five exploratory wells were drilled during 1974–75. The first exploratory well drilled in the field, OCSG-2698 Well No. 1, encountered hydrocarbons in Pleistocene sands while being drilled with 16.5 lbm/gal (1977 kg/m3) mud. The well was cased, and a drillstem test (DST) was made in a 10-ft (3.05-m) perforated interval. The well flowed at rates of 450 to 720 B/D (71.5 to 114 m3/d) oil. The shut-in bottomhole pressure (BHP) was 5.243 psig (36.1 MPa) [a 13.7-lbm/gal (1641 -kg/m3) equivalent] at 7,352 ft (2241 m) TVD. Following this DST, sand had to be washed from the well beginning at a depth 80 ft (24.4 m) above the perforated interval, indicating that sand control would be necessary in wells completed in this field. JPT P. 881^

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3