Industry First: Shunt Tubes Open Hole Gravel Pack Completion Through 9-5/8" Milled Casing Window in ACG Field, Azerbaijan

Author:

Susilo Raden Yoliandri1,Yahyayeva Narmina1,Saavedra Luis1,Loboguerrero Santiago1,Akhundova Gumru1,Rasul-zade Ali1,Whaley Kevin2

Affiliation:

1. bp Azerbaijan

2. bp America

Abstract

Abstract Azeri-Chirag-Gunashli (ACG) is a giant field located in the Azerbaijan sector of the Caspian Sea. The major reservoir zones are multi layers sandstone formations with oil column up-to 1000m, and weakly consolidated where Open Hole Gravel Pack (OHGP) completions have become the standard design for production wells. Development began in 1997 and to date more than 130 high rate OHGPs have been installed. Once existing wells has been uneconomically to be produced, a Sidetrack or Up-Hole Recompletion (UHRC) will be performed. The standard 9-5/8" sidetrack technique will be done by drilling new section, installing and cemented a 7-5/8" liner, then drilling 6.5"x8" hole in pay zone followed by running 4" Shunted Screen and gravel packing. Previously C&P technique has been used for UHRC option but it was producing at limited drawdown and quickly sand up when water break through. Cased Hole Gravel Pack (CHGP) technique has been trialed as UHRC option in the past 2 years but has limitation of the number zone & length can be perforated which resulted in leaving some zones unperforated behind casing. A new concept of UHRC has been designed and successfully tested. This concept consists of sidetracking into the overburden, drilling to TD and removing 7-5/8" liner section. Shunted screen then deployed into open hole through a cased milled window followed by gravel pack operation. While standalone screens have been deployed through cased milled windows before, deploying shunted screens through a cased milled window followed by an OHGP is an industry 1st. This technique delivers the well 20 days earlier compare to standard Sidetrack OHGP well due to removal 7-5/8" production liner section. This technique is also give advantage over stacked CHGP option because can provide higher k*h access, can handle high levels of differential depletion within the completed interval and has the potential to unlock up lot more well candidates to allow and deplete the reserves from overlying reservoirs. This paper will also describe window and well design to deliver successful Shunt Tubes OHGP installation with this technique.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3