Sensitivity Analysis of Choke Size Selections on Reservoir Pressure Drawdown Using Prosper Modelling for Reservoir Management

Author:

Gidado A. O.1,Adeniyi A. T.1,Olusola B.2,Giwa A.1

Affiliation:

1. Department of Chemical and Petroleum Engineering, Afe Babalola University, Ado-Ekiti, Ekiti State, Nigeria

2. Matrix Exploration and Production, Ikoyi, Lagos State, Nigeria

Abstract

Abstract It is important to know that analysis and selection of choke sizes for oil wells is imperative for production optimizations in reservoir management. Chokes are necessary in every wellhead completion for regulating flow from the reservoir. Random selection of choke sizes has been a bad practice. For the case study of this work, productions from 3 gas condensate wells have declined with pressure over three years. The initial reservoir pressures of 5870 psi, 4373 psi and 2248 psi, initial production rates ranging from 82.3 BOPD to 242.57 BOPD and 3.018 MMSCFD to 5.001 MMSCFD respectively, with choke sizes ranging from 22/64" to 24/64". However, these reservoir pressures have depleted over 3 years by about 100 psi to 3800 psi for each well with early water breakthrough ranging from 10% to 25% basic sediment and water (BS&W). No analysis of choke sizes selection to flow the wells at the initial stage. This research work has been carried out on pressure depletion control corresponding with its drawdown. This was achieved by modelling and simulating PVT data, completion data, IPR and VLP data and well-test data as well as sensitivity analysis with the aid of PROSPER. Results obtained indicated the need to reduce choke sizes, thereby reducing the drawdown. The reduction of choke size gave a decrease in production volume ranging from 15 to 59% for both oil and gas. However, the reduction in choke sizes also gave decrease in water production of about 92%, 100% and 22% for the respective wells. The choke size sensitivity analysis showed that continuation of the initial choke sizes on 24/64" gave a higher drawdown value above 100 psi, which increased the pull of water conning. Recommendation of the new choke sizes within 18/64" to 20/64" showed the drawdown of 79 psi, 71.5 psi and 80.5 psi. New choke size selection was recommended for the reservoir management of each well.

Publisher

SPE

Reference29 articles.

1. Reservoir Engineering Handbook;Ahmed,2001

2. Tubing Well Performance, Heat Transfer and Sizing;Bellarby;Developments in Petroleum Science,2009

3. Petroleum Engineering Handbook;Bradley,1987

4. Overview of artificial lift systems;Brown;Journal of Petroleum Technology,1982

5. Petroleum Engineering In Production;Damargalih,2009

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3