Affiliation:
1. Healy Energy
2. Sanford Engineering
3. Noble Energy
4. Baker Hughes Drilling Fluids
Abstract
Abstract
A case history from Offshore Israel is presented that describes the successful delivery of five (5) ultra-high rate gas wells (+250 MMscf/D) completed in a significant (10 TCF) gas field with 7 in. production tubing and an Open-Hole Gravel Pack (OHGP). Maximizing gas off-take rates from a gas reservoir with high flow capacity (kh) requires large internal diameter (ID) tubing coupled with efficient sand face completions. When sand control is required, the OHGP offers the most efficient as well as the most reliable, long-term track record of performance. A global study of ultra-high rate gas wells was made to select and finalize the design concept after which the commensurate engineering rigor was applied. This paper will highlight the design, qualification, Quality Assurance / Quality Control (QA/QC) and operational performance of the completion fluids inclusive of the Reservoir Drill-in Fluid (RDIF) and the breaker. Completion fluids are critical to the success and production efficiency of an OHGP. The completions were installed with minimal operational issues (Average NPT ≈4%). Production commenced on March 31, 2013. All wells have performed to expectations with maximum well rates up 340 MMscf/D.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献