Mature Field Economic Rejuvenation with Infill and Re-Entry Multilateral Well Creation Techniques

Author:

Butler Benjamin1,Roberts Justin1,Kelsey Matthew1,Van Der Veen Steffen1

Affiliation:

1. Halliburton

Abstract

Abstract Multilateral wells have been proven over decades and have developed into a reliable and cost effective approach to mature field rejuvenation and extended commercial viability. This paper will discuss case studies demonstrating a number of techniques used to create infill multilateral wells in existing fields with a high level of reliability and repeatability. Techniques reviewed will cover cutting and pulling production casing to drill and case a new mainbore versus sidetracking and adding laterals to an existing mainbore. Discussion will also cover completion designs that tie new laterals into existing production casing providing significantly greater reservoir contact. Temporary isolation of high water-cut laterals brought into production later in the well's life through bespoke completion designs will also be discussed. Case studies will include discussion of workover operations, isolation methods, and lateral creation systems. Where available, resulting field performance improvements will also be discussed. In Norway, slot recoveries are commonly performed by cutting and pulling the 10-3/4" casing, redrilling a new mainbore, and running new casing. This enables junction placement closer to unswept zones and easier lateral drilling to targets. It does have drawbacks, however, related to the additional time required to pull the subsea xmas tree and challenges associated with pulling casing. In 2019, Norway successfully completed a 10-3/4" retrofit installation, whereas a sidetrack was made from the 10-3/4" and an 8-5/8" expandable liner was run down into the reservoir pay zone where two new laterals were created. The 8-5/8" liner saved time otherwise spent having to drill the section down to the payzone from the laterals. These wells have a TAML Level 5 isolated junction, Autonomous Inflow Control Devices (AICDs) in each lateral, and an intelligent completion interface across the junction, enabling active flow management and monitoring of both branches. In Asia, infill laterals were added to existing wellbores by sidetracking 9-5/8" casing and tying production back to the original mainbore. These dual laterals were completed with intelligent completions to enable lateral flow management and monitoring of both laterals. In Australia, dual laterals were created in a similar fashion; laterals are added to existing wells; however, a novel approach was used to manage water from existing lower mainbore laterals whereby they are shut in at completion and opened later when the new lateral is watered out. The older lateral now produces at lower water cut given the time allowed for water coning in the lateral to relax. Using this practice, production is alternated back and forth between the two laterals. In the Middle East, an older well has been converted from TAML Level 4 to Level 5 in order to prevent detected gas migrating into the mainbore at the junction. This conversion of a cemented junction well has enabled production to resume on this well. The well was converted to incorporate an intelligent completion to enable flow control of each lateral. This paper intends to provide insights into the various mature field re-entry methods for multilateral well construction, and a review of the current technology capabilities and well designs through the review of multiple case histories.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3