Factors to be Considered in Drilling Optimization

Author:

Lummus J.L.1

Affiliation:

1. Pan American Petroleum Corporation

Abstract

ABSTRACT Extensive drilling research, particularly in the last ten years, hasresulted in a better understanding of the effect of drilling variables andtheir interactions. The practical application of this knowledge has kepthole-making costs at the 1958 level in spite of inflation. Optimized drilling, which was first applied on a comprehensive basis in 1967, has significantlyreduced drilling costs, although it has yet to reach its full potential. Optimized drilling is defined as the "mathematical treatment of the mostimportant controllable drilling variables to develop a comprehensiveminimum-cost drilling program". The variables involved in rotary drilling areclassified as alterable or unalterable and the variables selected formathematical optimization are herein described. A more detailed treatment willbe given to the most important variables optimized-mud, hydraulics, bits, weight and rotary speed. Rig selection and data acquisition are also discussed, as these factors play an important role in optimization. The paper includesdata which show that significant reductions in drilling costs have beenobtained when optimized drilling programs were effectively implemented. Aninteresting aspect of the data presented is that savings achieved in"second-round" optimums were significant and, in one case, more than thosesavings obtained in "first-round" optimums. This indicates that better data, more experience in applying optimized drilling principles and developingconfidence in the program are key factors in the successful use of this newdrilling approach. INTRODUCTION THE DEVELOPMENT OF ROTARY DRILLING can be divided into four distinct periods Conception Period, 1900-1920; Development Period, 1920-1948; Scientific Period, 1948-1968; and Automation Period, which began in 1968. The majoraccomplishments of the first three periods, and a prediction of what lies inthe future for the Automation Period, are shown in Table 1. In reviewing thesedevelopment periods, the question naturally arises as to the reason for theapproximate 30-year lapse between the end of the Conception Period and thestart of the Scientific Period. There are a number of reasons that can begiven, but undoubtedly the most significant one is that major oil fieldequipment firms, mud service companies and operators did not startappropriating the large amounts of money it takes to do high-quality drillingresearch until about 1948. When we look at the major accomplishments obtainedduring the Scientific Period, the most productive years are found to be from1958 to 1968. A measure of the impact of the drilling technology developedduring the latter part of the Scientific Period on hole-making costs, ascompared to total well costs, (can be seen from Figure 1). Total well costsincreased 14 per cent from 1958 through 1967, while hole-making costs remainedat the 1958 level; i.e., about $4.25/ft.111 Other costs, such as completion, logging and casing expenditures, increased 21 per cent. If the extensivedrilling research effort of the past 10 years had not been undertaken and hadnot been successfully reduced to practice in routine drilling operations, it isestimated that a typical 8,000–9,000foot hole would cost an additional$3.00/foot to drill today. This, would amount to a saving of about $500 millionfor 1967 alone, which is testimony to the fact that the investment in drillingresearch undertaken by many companies has paid off. Optimized drilling has beenone of the most significant accomplishments obtained during the Scientific Period, but it was not introduced on a comprehensive basis until 1967, andtherefore will not reach its full potential for several years. It is veryimportant to realize that optimized drilling would not be possible todaywithout the hard work of numerous researchers who have spent considerable timestudying the effects of drilling variables and how they relate to eachother.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology,General Chemical Engineering

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3