Successful Intervention of Coiled Tubing Rugged Tool with Real-Time Telemetry System in Saudi Arabia First Multistage Fracturing Completion with Sand Control System

Author:

Alduaij Ahmed N.1,Al-Bensaad Zakareya1,Ahmed Danish2,Bin Md Noor Mohd Nazri2,Batita Nabil2,Khan Abdul Muqtadir2

Affiliation:

1. Saudi Aramco

2. Schlumberger

Abstract

Abstract An openhole multistage completion required selective fracture stimulation, flow control, and sand control in each zone. An openhole multistage completion was designed by combining a production sleeve integrated with sand screens and inflow control devices and a fracture sleeve with high open flow port. The system was designed to use a ball drop to isolate the bottom intervals while fracturing upper intervals. After fracture stimulation, the fracture seat/ball needed to be milled. The production sleeve were designed to be shifted to the open position and the fracturing sleeve to the closed position through mechanical shifting tool to put the well on production. The fracturing sleeve and the production sleeve were located close to each other and a successful shifting operation needed an appropriate shifting tool, with a real-time downhole telemetry system that met the temperature limitations while providing accurate depth control, differential pressure readings, and axial force (tension and compression) measurements. Hydraulic-pressure-activated shifting tools were used to manipulate the sleeves. A coiled tubing (CT) rugged downhole tool with real-time telemetry was used to run the shifting tools. Yard tests were conducted to identify the optimum rates and pressures to actuate the hydraulically activated shifting tools and study their behavior. The expansion of the fracturing sleeve shifting tool keys initiated at 1.6 bbl/min (400 psi) and the keys were fully expanded at 1.8 bbl/min (600 psi), whereas the expansion of production sleeve shifting tool keys initiated at 0.3 bbl/min (700 psi), and the keys were fully expanded at 0.4 bbl/min (900 psi). During the design and planning of the shifting operation, simulations were conducted, and surface and downhole tools were selected carefully to ensure the CT could provide enough downhole upward force (5,000 to 6,000 lbf) to close the fracture ports and 2,000 to 4,000 lbf to open production sleeves. Following the fracturing operation, the first CT run aimed to mill fracture seats/balls to clear the path for the subsequent shifting operation. In the second CT run, all the fracturing sleeves were shifted to the closed position while production sleeves were shifted to the open position. The CT rugged downhole tool proved critical for depth correlation and accurate placement of the shifting tools. The real-time downhole acquisition of differential pressure across the toolstring also allowed operating the shifting tools under optimum conditions, while downhole force readings of tension and compression confirmed the shifting of completion accessories. Two fracturing sleeves were shifted to the closed position at 2.4 bbl/min and 700-psi downhole differential pressure, with the downhole weights of 700 lb and 1,000 lbf. Three production sleeves were shifted to open position at 0.6 bbl/min and 1,200-psi downhole differential pressure, and the maximum surface and downhole weights recorded were 73,000 lb and 19,200 lb, respectively. That operation led to sand-free production and confirmed the success of the first multistage completion enabling fracturing operation and controlling sand production in Saudi Arabia. This study describes the use of real-time downhole measurements and their significance when surface parameters do not give clear indication of shifting. It also features the first-time use of two hydraulically activated shifting tools operated during the shifting operation in Saudi Arabia's first multistage completion enabling fracturing operation and controlling flow/sand production.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3