Abstract
Abstract
The concept of "cutting costs at any cost" leads to poor short-term focused decisions which can result in higher total costs in the future. In many instances, any dollars saved in the initial completion are more than offset by costs incurred later in the life of the well. One such example is the operational difficulty and costs incurred in dealing with proppant flowback after fracturing operations are completed. In many such cases, a post-fracture cleanout is required before turning the well over to production, and subsequent additional cleanouts can be required after three to six months of production. This paper will examine the application of a completion methodology which has proven to minimize the inflow of proppant during both the fracture treatment, and during subsequent production. With minimal additional costs associated with the use of the method, the savings result in a benefit to profitability and capital preservation.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献