Sucker Rod Wear In Directionally Drilled Steamflood Wells

Author:

Mottram R.J.1

Affiliation:

1. Husky Oil Operations Ltd.

Abstract

Abstract Husky Oil's Thermal Operations District in the Lloydminster, Saskatchewan area, has had extensive experience with sucker rod wear in directionally drilled steamflood wells. Husky's two major steamflood projects, the Aberfeldy Steamflood Pilot (steam drive) and the Pikes Peak Pilot (cyclic with some post-cyclic stream drive), have drilled and produced directional wells from pads since 1983. As expected, the frequency of wear-related sucker rod failures in directionally drilled wells is much higher than in conventional vertical wells. Through careful data gathering and analyses, Husky has attempted to quantify the degree of incremental wear as well as identify the controlling mechanism(s) (i.e. maximum dog-leg, maximum hole angle, etc.). Rod wear-related problems are described in depth. The frequency and location in the rod string of the wear-related failures are compared with a number of parameters to determine the major factors contributing to rod wear. The various methods and items tested by Husky to reduce and control rod wear are described and discussed. A summary of conclusions based on the data as well as a suggested rod/tubing maintenance program are included in this paper. Introduction Husky Oil Operations Ltd. has been active in the Lloydminster, Saskatchewan / Alberta, heavy oil fields since 1946 and currently operates over 2000 producing wells and five active enhanced oil recovery (EOR) pilots. The Lloydminster operators produce from a series of lower Cretaceous sands at depths between 400 m and 600 m. The sands are reasonably clean, moderately sorted, and poorly consolidated. Porosity can vary between 25% and 35%. Permeability ranges from 0.5 darcies to 8 darcies. The oil produced in the area is dense and viscous. Density is generally between 911 kg/m3 and 980 kg/m3. Viscosity can be as high as 131 Pa •s. The original-oil-in-place in the Lloydminster area has been estimated at 500 million m3(1). Probably less than 10% is recoverable by conventional means, EOR recoveries have been estimated at 25%. Pad Well Completions Husky began drilling EOR wells from pads in 1983. The advantages of pad drilling are well documented and accepted by the operating companies in the area. The close spacing used in the EOR pilots (as low as 1 ha), the reduced cost of fluid injection and production lines, the centralization of facilities, and the large reduction in surface area requirements make pad drilling of EOR wells especially attractive. Husky currently has over 100 pad wells in its EOR pilots. Pad sizes vary between 3 and 14 wells. The wells are typically equipped with 178 mm casing, 89 mm EUE tubing, 22 mm grade C sucker rods, and 64 mm rod (insert) pumps. When the first pad wells were brought on stream in 1983 (at the Pikes Peak Cyclic Steam Pilot), the field personnel were expecting to have significant rod wear problems. The frequency of rod wear-related servicing was higher for the new wells but not alarmingly so. The installation of rod rotators and the implementation of a rod maintenance program kept the problem under control.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology,General Chemical Engineering

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3