Abstract
Abstract
North Kuwait Jurassic Gas asset has strategic importance for Kuwait production strategy as the only non-associated gas producing fields in Kuwait. This paper demonstrates the added value, experience, challenges and lessons learned of recent paradigm shift in Jurassic tight gas wells’ completion strategy from cemented liner to multistage completion. A successful expansion of Multi-Stage Completion (MSC) technology has been achieved on field level led by integrated team efforts since early 2020 to date. This helps to enhance overall well production potential, selective stimulation, overcome reservoir and intervention operations challenges, and early production delivery.
The Jurassic gas asset produces mainly from deep high pressure and temperature, conventional and unconventional tight carbonate reservoirs. The recovery from such complex heterogeneous reservoirs is extremely challenging if conventional development strategies are applied.
Due to the high reservoir tightness, permeability contrast among different flow units and dual permeability effect (matrix and natural fractures), well productivity potential significantly depends on the effectiveness of subsequent stimulation treatments of such complex heterogeneous reservoir to improve well productivity and connect the natural fractures.
Selecting proper well completion is critical to overcome such reservoir challenges and ensure efficient acid stimulation treatments of such unconventional formations that need convenient diversion mechanism during the stimulation to enhance the productivity of each individual reservoir layer, and enable future flexibility of selective re-stimulation and reservoir management.
The asset team has applied a step change in completion strategy to open-hole HPHT multistage drop-ball completions using state-of-the-art MSC technologies including closable frac ports, full 3.5in monobore post milling and debris sub to protect the MSC string during upper completion operations. This is to overcome such reservoir complexity, eliminate wellbore cleaning and multiple perforation intervention operations challenges and risks, eliminate cement quality uncertainties, improve overall cost, and fast track well delivery to production to meet asset production target by significantly reducing operation time from approximately one month of plug and perf technique to less than one week of continuous and less subsurface intervention operations.
Total of 23 new Multi-stage completions were successfully installed in last 2 years including 4 systems in horizontal unconventional Najmah reservoir with overall good production results and significant improvement in selective acid stimulation (matrix and Fracturing), intervention operations efficiency and fast well delivery to production. Therefore, the asset plans to continue expansion in Multi-stage completion strategy.
Based on gained experience, an integrated protocol for multi-stage candidate well selection, staging design and installation procedures workflow has been built by the integrated multidisciplinary team to ensure standard process across fields which can be used for application in other fields.
Reference8 articles.
1. Paradigm shift to Multistage Completion Strategy for Managing Tight Gas Development Challenges;Abdel-Basset;ADIPEC-2021
2. Abdullah
Al-Saeed
, AnoodAl-Dhafiri, ErkanFidan, and MajdiAl-Mutawa, Kuwait Oil Company; AhmadAbdul Hadi, Packers Plus Energy Services Inc. A Field Applications of Effective Stimulation High Pressure/Temperature Multi-Stage Completion which Shows Significant Well Performance Improvement in Deep North Kuwait Jurassic Unconventional Reservoir. SPE-197497-MS. ADIPEC, UAE, 11–14 November 2019.
3. Al-Saeed, A.
Al-Mefleh, K.
Al-Awadhi, M.
Pradhan, San. P, Fidan, E.Al-Failakawi, A.Abdelbagi, Mamoun. E.SamuelI, Engineered Perforation and Tubular Movement/Stress Modeling in Optimization of Complex Hydraulic Fracturing Application in Deep, Tight, Sour and HPHT Carbonates in North Kuwait. 2017 SPE-187604-MS Presented at the SPE Kuwait Oil & Gas Show and Conference held in Kuwait City, Kuwait, 15–18 October 2017.
4. Al-Saeed, A., Ahmed, Z. M., Fidan, E., . Successful Field Applications of Installing and Activating High Pressure/Temperature Multi-Stage Completion for Improving Well Performance in Deep North Kuwait Jurassic Formation. 2018. Paper SPE 193334-MS presented at the Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, UAE, 12–15 November.
5. Lee
Morgenthaler
, MaryS.VanDomelen, "A Practical Guide to Modern Diversion Technology" paper SPE 185120 presented at the 2017 SPE Oklahoma City Oil and Gas Symposium held in Oklahoma City, Oklahoma, USA, 27–31 March 2017.