Affiliation:
1. TDE Petroleum Data Solutions Inc. proNova
Abstract
Abstract
This paper addresses the measuring techniques that involved data quality control and automatic drilling operations detections of routine drilling operations that are available today in modern drilling programs, and goes through examples of how implementation was carried out in the onshore area that drilled a series of similar wells. Measurement accuracy, training, and the development of new work processes were successfully implemented that led to major KPI (Key Performance Indicator) time savings between 31% and 43%.
You cannot improve what you don't measure. And in this case you cannot measure without a proper data quality control (QC) procedure in place.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献