Makarem-l Relief Well Planning and Drilling

Author:

Roes V.C.1,Hartmann R.A.2,Wright J.W.3

Affiliation:

1. Petroleum Development Oman

2. Shell Intl. Research and Technical Services

3. John Wright Company

Abstract

Abstract This case history describes planning and execution of a deep relief well operation that resulted in re-entering, killing and abandoning a wellbore which was blowing in the subsurface. In 1994, a gas exploration well, Makarem, was sidetracked past a bottomhole assembly, which had become stuck almost 1,000m off bottom. A kick was subsequently taken, indicating charging of shallower horizons from a deep, sour, high-pressure gas reservoir at potentially high rates. Attempts to reenter the original wellbore while drilling ahead in the sidetrack hole were unsuccessful. The well was re-entered in 1997 with the objective of isolating the flowing zone to prevent potential environmental impact, future drilling problems, and the loss of hydrocarbon reserves resulting from uncontrolled flow of gas in the subsurface. This case history reviews planning and execution of a deep horning-in operation to locate and re-enter the 12 1/4" open hole below the bit of the stuck assembly, 3680m below surface. Key issues addressed during the planning phase included relief well strategy, positional uncertainty, well control scenarios, options for isolation and contingencies. An active electro-magnetic ranging technique was employed to successfully locate and track the target assembly to an eventual direct intersection with the crossflowing hole. Execution of the intersection plan is detailed, with emphasis on horning-in on the fish, borehole surveying techniques and quality assurance. Also covered is the operational organisation, and details of the activities following intersection, which included stabilisation, cleanout and abandonment of almost 1,000m of borehole which had been inaccessible for over 3 years. P. 367

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A calculation model for improving the relative borehole uncertainty based on the least square method in relief well;Journal of Petroleum Science and Engineering;2022-10

2. Modeling and Simulation of Electromagnetic Anti-collision While Drilling;2022 4th International Conference on Intelligent Control, Measurement and Signal Processing (ICMSP);2022-07-08

3. Research into magnetic guidance technology for directional drilling in SAGD horizontal wells;Petroleum Science;2013-10-13

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3