Multiphase Flow Meter Health Monitoring Strategy: Maximizing the Value of Real-Time Sensors and Automation for Industrial Revolution 4.0

Author:

Al-Kadem Mohammad1,Gomaa Mohammad1,Al Yateem Karam1,Al Maghlouth Abdulmonam1

Affiliation:

1. Saudi Aramco

Abstract

Abstract The Cement Packer approach has been successfully implemented to pursue and monetize minor gas reservoirs of poorer quality. Due to its critical role in power supply to meet the nation's needs, license to operate gas fields oftentimes come with contractual obligations to deliver a certain threshold of gas capacity. The cement packer method is a cheaper alternative to workovers that enables operators to build gas capacity by monetizing minor gas reservoirs at lower cost. Group 1 reservoirs are the shallowest hydrocarbon bearing sand with poorer reservoir quality and relatively thin reservoirs. The behind-casing-opportunities in Minor Group-1 reservoirs previously required a relatively costly pull-tubing rig workover to monetize the reservoir. Opportunities in two wells were optimized from pull –tubing rig workovers to a non-rig program by implementing Cement Packer applications. The tubing was punched to create tubing-casing communication and cement was subsequently pumped through the tubing and into the casing. The hardened cement then acted as a barrier to satisfy operating guidelines. The reservoir was then additionally perforated, flow tested and successfully monetized at a lower cost. Tubing and casing integrity tests prior to well entry demonstrated good tubing and casing integrity. This is critical to ensure that cement will only flow into the casing where the tubing was punched. Once the cement hardened, pressure test from the tubing and from the casing indicated that the cement has effectively isolated both tubulars. Subsequent Cement Bond Log and Ultrasonic Imaging Tool showed fair to good cement above the target perforation depth. These data supported the fact that the cement packer was solid and the reservoir was ready for additional perforation. Taking into account the reservoir quality, it was decided to perforate the reservoir twice with the biggest gun available to ensure the lowest skin possible. Post perforation, there was a sharp increase in the tubing pressure indicating pressure influx from the reservoir. Despite that, casing pressure remained low, confirming no communication and thus the success of the cement packer.The well was later able to unload naturally due to its high reservoir pressure, confirming the producibility of the reservoirs and unlocking similar opportunities in other wells. Additionally, the cement packer approach delivered tremendous cost savings between $6 – 8 mil per well. Besides confirming the reservoirs' producibility,the success also unlocked additional shallow gas behind casing opportunities in the area.This method will now be the first-choice option to monetize any hydrocarbon resources in reservoirs located above the top packer.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3