Application of Horizontal Wells at Prudhoe Bay

Author:

Sherrard Dave W.,Brice Bradley W.,MacDonald David G.

Abstract

Summary. Horizontal wells have been shown to increase productivity, to reduce coning tendencies, and to improve recovery. Given the potential applications in the Prudhoe Bay field, a project was initiated in 1984 to evaluate benefits and to drill and test three trial wells. This paper reviews production and reservoir engineering aspects of the trial program. It includes the objectives of the test program, the planning and drilling of three wells, the forecasting of production rates and recoveries, and the testing and analysis of actual well performance. In summary, the three wells have been successfully drilled and completed, with each well costing less than its predecessor. The wells have exhibited productivities two to four times that of conventional comparison wells, and increased oil recovery is anticipated. Horizontal wells can improve production rates and recoveries by a variety of mechanisms. At their most basic, the long wellbores allow longer completed intervals and therefore increased production rates. In reservoirs overlying an aquifer or located under a gas cap, the increased standoff from the fluid contacts can improve the production rates without causing coning. Additionally, the longer wellbore length serves to reduce the drawdown for a given production rate and thus further reduces coning tendencies. Fractured reservoirs can also benefit from horizontal wells. Long wellbores are likely to intersect more fractures and hence improve both production rate and ultimate recovery. Furthermore, the application of horizontal wells early in a project may allow development with fewer wells because of the larger drainage area of each well. In some fields, the advantages of horizontal drilling may allow development where conventional techniques would be uneconomical. The development of the Prudhoe Bay oil field, on the North Slope of Alaska, has been extensively reviewed in published literature. For reference, a field outline showing waterflood and non-waterflood area (Fig. 1) and a gamma ray log section depicting the various zones (Fig. 2) are included. Two areas of the field offer some of the potential advantages of horizontal drilling previously outlined.1. The midfield area generally contains a thick remaining oil column overlain by an expanding gas cap. Because Prudhoe Bay production will become constrained in the near future by the ability to compress and to reinject produced gas, rather than by oil productivity, immediate field production rate increases will result from reducing gas coning.2. The extreme downstructure part of the Prudhoe reservoir is undeveloped. The thin oil column and potential problems caused by water coning from the underlying aquifer have made development relatively unattractive to date. Horizontal wells offer the possibility of reduced coning and increased production rates, perhaps increasing the attractiveness of development. Projected remaining oil at abandonment for the entire field is about 12 billion STB [1.91 × 109 stock-tank m3], a significant target for any improved recovery scheme such as horizontal drilling. Given this potential target, well locations were screened for application as horizontal wells. A three-well program was selected to address both target areas and to develop a broad experience base. The selected well locations are shown in Fig. 3 and are discussed here. First Well Location (JX-2). This 80-acre [32-ha] infill location is in a structurally simple part of the field. Stepout from the gravel pad (from which all Prudhoe Bay wells are drilled) is less than 5,000 ft [1524 m], allowing a reasonable directional profile to the larger depth at 8,915 ft [2717 m]. The well is located at the base of the oil column to maximize standoff from the gas cap. Drilling technology and drainage area considerations limited the design completion length to 1,500 ft [457 m]. Second Well Location (B-30). The second midfield horizontal well was not spudded until after the initial well was tested. This second well increased drilling experience before the more difficult drilling associated with the Y-20 location. This experience factor and the additional reservoir performance data justified two horizontal wells in the midfield area. Third Well Location (Y-20). Y-20 was recommended as the third horizontal well and the first in the peripheral area. This would be an extended-reach well completed at the top of the reservoir to maximize standoff from the aquifer. The thin oil column in the periphery and longer stepout made this a more difficult, higher-risk well to drill. The stepout to the beginning of the horizontal section was approximately 8,300 ft [2530 m]. This exceeded the 5,000-ft [1524-m] stepout restriction placed on the first well. Information from the first two wells, however, was designed to permit a stepout of this magnitude. Because of the increased stepout, design length for this completion was limited to 1,000 ft [305 m]. Evaluation of Benefits Empirical, analytic, and numerical simulation methods were used to forecast the benefits of the horizontal wells planned for Prudhoe Bay. The benefits considered are productivity, critical coning rates, and recovery. Productivity. The productivity of a conventional well is proportional to the permeability-thickness product. Low productivities result from low values of permeability or formation thickness (or both). This can be compensated for in horizontal wells where the length of the horizontal section is not imposed by nature but chosen. The permeability-length product in horizontal wells plays a role similar to that of the permeability-thickness product of conventional wells. P. 1417^

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Multilateral Wells to Control Water Inflow in Reservoir Connected to Active Underlying Aquifers: A Technical and Economic Analysis;Day 1 Wed, June 14, 2023;2023-06-07

2. Historical Development from Fracturing to Hydraulic Fracturing;Environmental Considerations Associated with Hydraulic Fracturing Operations;2019-04-12

3. Drilling Technology and Well Completion;Subsea and Deepwater Oil and Gas Science and Technology;2015

4. New Cold-Production Technique for Heavy Oil With Strong Bottomwaterdrive;SPE Journal;2013-08-06

5. References;Advanced Reservoir Management and Engineering;2012

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3