Probabilistic Forecasting of Unconventional Resources Using Rate Transient Analysis: Case Studies

Author:

Anderson D. M.1,Liang P..1,Okouma V..2

Affiliation:

1. Fekete Associates Inc.

2. Shell Canada Energy

Abstract

Abstract Reliable, early determination of long term production and ultimate recovery in oil and gas reservoirs is of utmost importance to E&P companies, reserves auditors and investors. In conventional reservoirs, the EUR can be reliably estimated once the drainage volume (hydrocarbon pore volume) has been established. This can be done using Rate Transient Analysis (RTA) if the presence of boundary dominated flow can be observed in the data. Unfortunately this approach is not easily applied to tight, fractured reservoirs because of the complexity of these reservoirs (which leads to non-unique reservoir characteristics) and the presence of persistent transient flow (which leads to non-unique estimations of ultimate recovery). In some instances, boundary dominated flow may not be observed until several years have elapsed during the producing life of the well. In recent years, there have been numerous contributions to the science of well performance-based methods for estimation of ultimate recovery of unconventional resources. Wattenbarger et al. (1998) and Brown et al. (2009) propose analytical techniques while Ilk et al. (2008), Valko and Lee (2010) and Duong (2011) have each proposed new empirical decline curve equations. While each of these methods has value, they do not specifically address the problem that underpins all unconventional well analysis, uncertainty. In 2011, the authors proposed the use of probabilistic rate transient analysis to help quantify this uncertainty. This approach acknowledges the non-uniqueness inherent in the RTA model inputs and allows for the systematic investigation of an allowable parameter space based on acceptable ranges of inputs such as the conductivity, spacing, complexity, length and height of the fractures and the matrix permeability. The result is the full set of possible production forecasts (in as much as the model can be said to capture the physics of the problem) from which the "most likely" production profile can be extracted and that help define the uncertainty in long-term recovery for the play. In this paper, we will further explore probabilistic rate transient analysis by presenting a case study from the Montney play in Canada. The primary objective of this work is to illustrate that a probabilistic approach can be practical, reliable and systematic, offering a viable alternative (or complement) to the standard deterministic techniques.

Publisher

SPE

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3