Development of a Completion Model for the Monitoring of EOR in Wells with Heavy and Extra Heavy Crude in the Largest Deposit in Latin America

Author:

Pena Gerardo1,Patiño Deivy2

Affiliation:

1. Rosneft, Completion engineer advisor

2. Halliburton, Completion engineer technical support

Abstract

Abstract To validate the completion model, a computer simulation was performed in four scenarios to predict mechanical failure limits. Consequently, a completion design model was obtained using vacuum-insolated tubing (VIT) that enables a minimum of 75% of steam quality given an inlet steam quality of 80%. In addition, a seal bore is used at 50° to 60° of inclination, which enables the upper completion disconnection/connection through the seal stinger at that depth, without losing production capabilities for changes in the depth of top of connection of tie-back. This paper describes the type of completion development and challenges encountered during the design. The advantages and benefits of collecting the correct information in the process of thermal recovery in the joint venture are also discussed. The investigation resulted in a completion model of thermal wells that will enable the monitoring of the conditions of the injection, tubing, casing, and injection effectiveness in the system in which the cyclic process is applied and adjusted to wells in the Orinoco Belt. A conclusion of this investigation is that, during the injection, the movement of production string and the monitoring component must be independent to avoid the transference of stress resulting from thermal expansion. Polished bore receptacles and seal assemblies should be used in the replacement of expansion joints; this will enable the upper completion to be used for recovery and changed for the injection system. Although completion models have been developed in which the steam path can be monitored, they have not been developed previously for use in long horizontal section wells, as was performed in this case. The problem of thermal expansion of the tubing during steam injection is expected to be resolved with the implementation of the design based on this study. Feed-through packers have already been developed especially for this process, although with a mixed record of successful and unsuccessful deployments. The monitoring system must be mechanically independent of the injection system, such that movements associated with expansion and contraction do not have a significant effect.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3