Abstract
Abstract
ADNOC is progressing with large-scale rig-less high-rate matrix stimulation by deployment of advanced lower completions. A key contribution to future production growth is expected to come from these "Smart Liners" that rely on the principles of the limited-entry technique. The concept is based on a number of small, pre-drilled and unevenly spaced holes which enable an even distribution of acid along the entire reservoir drain to be stimulated. The smart liner incorporates swellable packers to avoid annular flow of acid to preferential zones and to isolate segments with heterogeneities.
In this work, we focus on aspects related to planning, design and execution of high-rate matrix-acid stimulation of wells. We demonstrate that short wells need a different design approach compared to extended-reach wells and we provide guidelines on how to achieve the highest achievable pump rate and desired acid volume subject to reservoir, well and equipment constraints.
The carbonate reservoirs typically exhibit considerable variation in permeability along the well, hence techniques for production profiling, such as inline tracers, are valuable for assessing the actual stimulation effectiveness. Wormhole penetration for a particular acid system will vary depending on the rock petrophysical properties and the reservoir properties; therefore, a systematic data analytics project is on-going.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Integrating Learnings from Matrix-Acid Stimulation of Smart Liner Completions – A Template for the Future;Day 3 Wed, October 18, 2023;2023-10-09
2. Design of Limited-Entry Completions Using Near-Wellbore Simulator for Effective Acid Stimulation of Heterogeneous Carbonates;Day 4 Thu, October 05, 2023;2023-10-02
3. Large-Scale Acid Jetting of Smart Liner Completions - Learnings and the Way Ahead;Day 4 Thu, October 05, 2023;2023-10-02
4. Comprehensive Screening of Available Technologies to Improve Productivity of Complex Undeveloped Carbonate Reservoir for Optimizing Field Development Plan Abu Dhabi UAE;Day 2 Tue, October 03, 2023;2023-10-02
5. Unlocking Hydrocarbon Potential in Tight Gas Reservoir in Onshore Abu Dhabi Through Different Completion Technologies;Day 1 Mon, October 02, 2023;2023-10-02