A Note on Well Cementing at Low Temperatures

Author:

Clark Roscoe C.1

Affiliation:

1. Stanolind Oil and Gas Co.

Abstract

In October 1945. R. F. Farris, in an AIME paper entitled "Method ForDetermining Minimum Waiting on Cement Time," presented a method forcalculating the minimum WOC* time required in oil well cementing operations.Briefly, this method consisted of shutting in a well after the cement had beenplaced, and noting the time required for the wellhead pressure to reach amaximum. This time was then multiplied by a factor of 1.5 to determine when thecement had reached sufficient strength to support the weight of thecasing. As a result of this work, a number of areas have reduced their WOC timerequirements with the subsequent saving of considerable rig time. The tests conducted by Farris were for the most part, conducted under cementingtemperatures in excess of 70'F. This was done because in the overwhelmingmajority of cases, cementing temperatures are in excess of 70'F (only in thenorthern part of the country, primarily in the Rocky Mountain area, incementing surface casing are temperatures below 70'F. encountered, and suchtemperatures occur only during the winter months). The Stanolind ResearchLaboratory since that time has performed a number of tests both in thelaboratory and in the field to evaluate this WOC factor when cementingtemperatures are lower than 70'F. The results of these tests indicated theneed for greater WOC time in areas affected by abnormally low cementingtemperatures. These tests indicated that a WOC factor of 2 (Time from start tomix cement to maximum wellhead pressure x 2 = Time to drill plug) will allowsufficient time for the cement to develop adequate strength. A field test under abnormally low cementing temperatures (surface temperature35'F, mud discharge temperature <70'F, and cementing depth 500'Ft.) in theRangely Field, Colorado, using the WOC factor of 2, indicated the time to drillthe plug as 45 hours. Well conditions preventing getting back into the welluntil a 48-hour WOC time had elapsed. At this time, the plug drilled firm tohard indicating that the cement had reached its final set. It is contemplated that during next winter additional field tests will beperformed to further check the results of the laboratory and field testsconducted to date. *WOC, abbreviation for "waiting on cement", indicates the time from when thecement is mixed to the time when sufficient strength has been obtained to allowthe drilling of the plug.

Publisher

Society of Petroleum Engineers (SPE)

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Micromechanics of hydraulic fracturing and damage in rock based on DEM modeling;Granular Matter;2020-05-15

2. The Synthesis and Characterization of a Clean Hydrofracturing Fluid;Petroleum Science and Technology;2010-09-21

3. FRACTURE MECHANICS APPROACH TO HYDRAULIC FRACTURING STRESS MEASUREMENTS;Fracture Mechanics of Rock;1987

4. Hydrometallurgy;Advances in Chemical Engineering Volume 9;1974

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3