Abstract
Abstract
This paper addresses the opportunities of maximizing the condensate production in a giant Recycle Gas-Condensate Reservoir in UAE. The condensate reservoir is producing many years under recycling mode to maintain the pressure and maximize the gas condensate recovery. The producers and injector wells are in a line drive pattern where the injected fluid is lean gas to maintain 100% VRR. The condensate production declined through the years due to gradual pressure decrease as well as injected lean gas/N2 breakthrough. Several studies were done to increase condensate recovery and extend gas production plateau.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献