Economics of Water Flooding

Author:

Brundred L.L.1,Brudred Latham L.1

Affiliation:

1. Brundred Enterprises

Abstract

Abstract Water flooding has progressed from the haphazard experimental stage through numerous phases to a somewhat precise engineering achievement. Unfortunately the economics, which are dependent on so many variables, have not yet lent themselves to particularly accurate interpretations. Recognizing that technical studies are proceeding rapidly, there still are divergent schools of thought. Regardless of divergences of opinion, the first step in any proposed project is a complete engineering study, evaluated in the light of past experience. The economics fundamentally boil down to the component parts of the following simple formula: Expected Gross Revenue less The Summation of Computed Acquisition Costs, Costs of Development, and Operating Costs (over the life of the flood) equals Estimated Gross Profit. Estimated Gross Revenue can be fairly reliable determined from the initial engineering study. Acquisition costs must be based upon the true value of the property and are always subject to negotiation. Development costs are influenced by many factors, but are largely controlled by the depth and the spacing used. They can be estimated with reasonable accuracy once the spacing program has been adopted. Operating costs ]do not lend themselves to ready determination because of the variables involved, but reasonably accurate estimates are possible. There is no substitute for experience. Approximately seven out of 10 waterflood attempts are failures. It is just as important to determine basic causes of failure as it is to study successful floods. Good floods are widely publicized, the poor ones never. Most of these failures can be attributed to improper engineering, lack of experience, or shortage of working capital. Engineering and economics are inseparable, and a proposed flood, based on sound engineering, must meet heavy financial demands. While waterflooding is often considered one of the safest of oil ventures, it, too, can be hazardous. "First results" are often long delayed, and pay out is invariable slow. The conclusion is inescapable that successful waterflooding requires three basic essentials: engineering, experience, and economics.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3