A Methodological Workflow for Assessment and Design of a Huff-N-Puff Hydrocarbon Gas Injection Pilot Test as an EOR Technique for Eagle Ford Shale Oil Reservoirs

Author:

Baldwin Amanda1,Lasecki Leo1,Mohrbacher David1,Porter Lee1,Tatarin Triffon1,Nicoud Brian1,Taylor Grant1,Zaghloul Jose1,Basbug Basar2,Firincioglu Tuba2,Barati Ghahfarokhi Reza3

Affiliation:

1. Chesapeake Energy

2. NITEC

3. University of Kansas

Abstract

Abstract Implementation of miscible gas huff and puff (HnP) for Improved Oil Recovery (IOR) requires timely identification of prospective projects, a demonstration of economic feasibility through pilot testing, and efficient scale-up of HnP operations. HnP pilot design and execution of the pilot project requires a minimum of 9 to 12 months to procure, and another 8 to 12 months to construct and operate. A substantial capital investment, approximately $1 to $5 million per pilot well, is also required (Texas Railroad Commission & Industry Operators). The lead time for procuring specialized compression can require 9 to 15 months. These early purchases comprise a large proportion of project capital investment. Collaboration by a variety of technical disciplines is required to efficiently design, construct, and operate a pilot with the goal of expanding IOR operations. An effective, collaborative approach allows for development of a HnP design that integrates both subsurface and surface design criteria. A workflow for design of HnP pilot testing was developed to coordinate concurrent project efforts including completion of reservoir characterization, engineering, permitting, stakeholder review and approvals, gas contracting, construction, testing and full-scale execution. Effective coordination of these efforts will result in efficient project implementation with minimal impacts on project scope, schedule and cost. Use of the workflow also allows for timely identification and mitigation of multiple project risks associated with design, construction and operation of IOR. Well executed pilot tests will accelerate the learning curve for application of HnP IOR in Eagle Ford wells; resulting in lower capital costs, lower operating costs, and increased operational reliability. Pilot test results will also be used to up-scale IOR operations in a cost-effective manner.

Publisher

SPE

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3