Flow Assurance Strategies in Indian Deepwaters: Issues and Means of Mitigation

Author:

Rathod P.Ramulu. Ramulu1,Sinha N..1,Ravishankar B..1

Affiliation:

1. Oil and Natural Gas Corporation Ltd

Abstract

Abstract The relentless exploitation of hydrocarbon resources to meet ever increasing demand has compelled upstream companies to focus on deep and ultra-deepwater. Flow assurance is one of the most critical aspects in field development. The hydrocarbon product needs to be transported from a remote well to the process facility, without experiencing significant energy losses to the environment. Some of the oil discoveries in Indian deepwater are having high wax content; high Wax Appearance Temperature (WAT) and pour point flow assurance is a major challenge in low ambient temperatures. A number of solutions like chemical injection (CI), mechanical insulation (Vacuum Insulated Tubing (VIT), Pipe-in-Pipe (PIP) etc.), Pigging, Piggy back line (PBL) and Electrical heating of flowline (EHFL) are the available means of mitigation to address these flow assurance challenges. In addition to high ‘steady state’ thermal insulation performance, the system has to provide good transient cool down behavior to prevent wax or hydrate formation during shut down and to minimize the time required for start-up. Through this paper an attempt has been made to generate a matrix for identifying the likely option for the means of mitigation individually or in combination, both for steady state and transient scenarios. The various options have been studied for suitability for flowline under different flow scenarios like steady state, shutdown, restart, and turndown and for redundancy. Emerging options are further technically analyzed qualitatively, based on the extent of field use, robustness, tangible & intangible benefits etc. and evaluated to arrive at a suitable flow assurance strategy. For field X located in 600–700 meters of water depth, the combination of PIP and CI with EHFL as a fall back is emerging as the most suitable option. During initial start-up, the flowline can be preheated using electrical heating and the sample taken for identification of suitable inhibitors and for arriving at the required dosage. During shutdown and restart scenarios electrical heating of flowlines can be adopted to prevent the fluid from gelling. The solution matrix presented in this paper will help in evaluating the available options and to arrive at the best suitable flow assurance strategy and means of mitigation, to any field during all operating scenarios.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Optimization of Pipe Insulation Volume for a Subsea Production System;Journal of Offshore Mechanics and Arctic Engineering;2020-02-24

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3