Comprehensive Assessment and Targeted Approach to the Implementation of the Gas-Lift Method of Operation on the Yamal Peninsula Novy Port Field

Author:

Blyablyas Aleksander Nikolaevich1,Vershinin Sergey Anatolevich1,Afanasiev Petr Nikolaevich2,Mingazov Ayrat Anvarovich2,Akhmetgareev Rustem Faridovich2

Affiliation:

1. Gazpromneft Science and Technology Center, LLC

2. Gazpromneft Yamal

Abstract

Abstract As geological environment becomes more complicated, specifics of oil fields with high gas content more demanding, and the Company's requirements for assets development efficiency more stringent, new challenges arise that require application of high-tech approaches and new tools to solve the tasks set. The era of "easy" oil is far behind, and there are no "simple" tasks left, so the key goal of oil companies now is to radically improve efficiency of existing "difficult" fields including development of gas condensate reservoirs and oil rims. The interest in development of new approaches to improve efficiency of the Novoportovskoye field is caused by the huge potential of the asset. Despite the fact that the field was discovered back in 1964, its remaining reserves are estimated at more than 250 million tons of oil and gas condensate and more than 270 billion cubic meters of natural gas, which are concentrated in five reservoirs. The Novoportovskoye field is the northernmost and largest on the Yamal Peninsula, but the complexity of its development and operation is caused not so much by geography and the lack of transport infrastructure but by the presence of a gas cap, low reservoir permeability, the occurrence of underlying water, and high gas content in produced reservoir fluid. The high gas content complicates the production process. The main method of operation in the existing fields of the Yamal Peninsula is artificial lift by electric submersible pumps (ESP) on rental basis. Given the remoteness and isolation of the Arctic region, the high cost of equipment rental, and the low efficiency of ESPs in liquids with high content of dissolved gas, it is only fair to ask a question of whether there is a tool that may allow us to predict operation parameters for different lift methods. The existing models and tools intended to assess behavior of the field are not good enough to fully predict gas breakthrough rates, optimize well operation parameters in case of short-term production forecasting, or select the optimal lift method. In this paper, we described application of an integrated modeling process for a targeted assessment of well operation parameters at the Novoportovskoye field. Also, in the framework of this paper, we performed a technical and economic estimation of the options under consideration, and formulated some recommendations to improve efficiency of development and operation of the field under the impact of the existing complicating factors.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3