Getting Past the Deepest Barrier Using Plasma Based Punctures: A Case Study on the Mature Panna Field, Western Offshore, India

Author:

Abbasi Shariq1,Tyagi Chirag1,Chakrabarty Toushar2

Affiliation:

1. Sourabh Maltare BG E&P India Ltd

2. HLS Asia

Abstract

Abstract Panna field is located in the western offshore region of India and produces oil and gas from Middle Eocene and Early Oligocene Bassein limestone. Production is taken mostly through 3 ½" or 4 ½" tubing through a packer set in 7″ liner. The Panna-Mukta-Tapti Joint Venture (PMT JV) took up a plan to revive wells addressing well integrity issues and limitations associated with old completion jewelry for increasing the production. Work-over campaign was planned for four wells on PB and three wells on PC platform to enhance production. The plan was to cut and retrieve the old completion and tubing above the 7″ permanent packer and install improved completion, having facilities of Permanent Down Hole Gauges (PDHG), Gas Lift Mandrel (GLM) and Chemical Injection Mandrel (CIM) through an additional packer set in 9-5/8″ casing. In line with two barrier philosophy, two plugs were set inside the production tubing, one at TRSSV (shallow-set) and another one below the production packer (deep-set). The plug below the production packer doubled-up to also hold back the workover fluid, which may have hampered the productivity of an already sub-hydrostatic reservoir, if losses occurred. However, at the end of workover operations, the retrieval of this deep set plug could not be done even after various attempts and spending valuable rig time. This problem was faced with three out of the first four wells, which proved to be a challenge and forced the team to devise a new strategy for remaining wells. At this point, an ingenious solution was devised to employ Plasma Based Punctures (PBP) to puncture the tubing in the limited space between the packer and the deep set plug to kick back the wells into production. Rig based PBP operations were carried out on two PC wells and Rig less PBP operations were carried out on three PB wells to get them online post work over operation. This resulted in saving several hours of rig time as the deep set plugs could not be retrieved in the conventional planned slick line operations. This paper intends to highlight the challenges faced, and how PBP proved to be the optimum solution, by simplifying operations and ensuring the timely delivery of production. The PBP operations proved viable through savings on energy, resources, time and cost associated with work-over jobs. The potential savings were roughly 780,000 bbls of oil which were significant for the aging asset. It is therefore, a potent alternative to other costly solutions in a scenario that often fails to deliver objectives, as happened in this campaign.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Marine Mineral Resources;Environmental Oceanography and Coastal Dynamics;2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3