Affiliation:
1. ConocoPhillips China Inc.
2. Bassam Zreik
Abstract
SPE Gulf Coast Section Electric Submersible Pump Workshop, The Woodlands, Texas, 25–27 April, 2007
Abstract
ConocoPhillips China Inc. (COPC) operates the Penglai 19–3 oil field, located offshore in Bohai Bay, the People's Republic of China. COPC holds a production sharing agreement with China National Offshore Oil Corporation(CNOOC). The Penglai 19–3 field is the second largest oil field in China with 3.8 billion bbl of oil in place, discovered in May 1999 and put on productionin December 2002.
Electrical submersible pumps (ESPs) were selected as the most economic artificial lift method to develop the field, based on the reliability, flexibility and robustness to produce wells with high flow rates and lift heavyoil in an offshore environment.
The first ESP installations were challenged with high free gas and excessives and production, resulting in operational issues and a number of failures. Even in this hostile environment, production peaked at 37,800 BOPD during November 2003, before declining as a consequence of reservoir pressure depletion. Moreover, the lower reservoir pressure increased the free gas, thereby reducing pump performance, excessive sand production lead to plugging of the pumping system and sand fill across the reservoir reduced productivity.
Various enhancements to the completion and ESP system were made during subsequent well interventions improving ESP performance, maximizing and maintaining production from the field. Furthermore, performing continuous ESP data trend analysis and performance modeling enabled the artificial lift system to be analyzed and diagnosed to maintain optimum well performance. Collaboration between Operator and Service Provider through performance review meetings and changes to operational practices were also implemented.
This paper reviews the operation, optimization, and performance of the ESP systems and the challenges faced during the first 3 years of production. Covering initial installations, subsequent well interventions, operation philosophy, optimization methodology, case studies demonstrating value of gas separation and handling devices, completion improvements, ESP configuration enhancements, run life assessment and equipment dismantle findings.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Producer Acid Stimulation to Remove Near Wellbore Damage in Unconsolidated Sandstone Reservoirs: Lessons Learned, Best Practices and Challenges in Penglai Oilfield, Bohai Bay;Day 2 Thu, February 22, 2024;2024-02-14
2. Success Story of a Novel Completion Technology of Hybrid ESP-Gas Lift System Trial;Day 3 Thu, October 12, 2023;2023-10-06
3. Sand Control Through Frac Pack: Learnings from Over 400 Wells in the Penglai Oilfield, Bohai Bay, China;Day 1 Tue, September 12, 2023;2023-09-12
4. Feasibility study formulation for the applicability of rigless temporary ESPs;Journal of Petroleum Exploration and Production Technology;2022-04-20