AbstractThe high-pressure/high-temperature (HPHT) environment poses different challenges for a cement design. In addition, there are challenges with the tight annular clearances across the liner overlap with the previous casing, and then finally achieving the desired top of cement. Engineering solutions and best practices can be implemented to overcome the challenges encountered while cementing under these conditions. A heavyweight engineered spacer with loss circulation material and an expandable-rotatable liner hanger were key components of the success.Thoughtful analysis of the equivalent circulating density (ECD) resulted in the design of the train of fluids with a density difference of no more than 0.5 ppg. However, to overcome the risk of losses, an engineered spacer with a tailored load of its main component based on extensive lab testing was used. The weighting agent was carefully selected to ensure stability and rheological hierarchy. The cement job was performed with backside pressure applied with Managed Pressure Cementing (MPC) to keep a constant downhole pressure. To improve displacement efficiency and enhance cement bonding, an expandable liner hanger was rotated throughout the entire job and set afterwards.The best practices implemented to cement the 9 5/8in liner resulted in performing the cement job without losses or flow. The ECD was kept within 5% from the mud weight density, based on the pressure match simulation. No abnormal pressures were observed while pumping and displacing indicating no settling issues were endured with the engineered spacer. Additionally, the liner hanger's unrestricted bypass area assisted in reducing the ECD's as no slips were required to keep it in place. The liner hanger was successfully rotated at 15 rpm throughout the job providing good cement placement. After the cementing job, the Liner hanger expanded successfully which confirmed the liner top integrity with a metal-to-metal seal. The expandable liner hanger also allows for less leak paths in the system along with providing high sealing and loading capability in high temperatures with a gas tight seal rating. After the wait on cement (WOC) time, the positive and negative tests were performed successfully meaning that a sustainable barrier was achieved.This paper describes a success story while cementing under HPHT conditions with very narrow margins between pore pressure and fracture gradient and depicts the best practices that contributed to the success of the job, such as using a heavyweight engineered spacer with LCM and an expandable/rotatable liner.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3