Progress Review of the K&S Carbonated Waterflood Project

Author:

Hickok C.W.1,Christensen R.J.1,Ramsay H.J.1

Affiliation:

1. Oil Recovery Corp.

Abstract

Abstract A carbonated waterflood process which comprises the treatment of a hydrocarbon reservoir with controlled amounts and concentrations of carbon dioxide is one of the newer methods of increasing oil recovery being used in a commercial field application. The process consists of the treatment of a crude-oil reservoir with controlled amounts and concentrations of carbon dioxide (CO2) or solutions of carbon dioxide. To achieve this end, the techniques of water flooding are combined with the injection of carbonated water into a reservoir during the early stage of the flood. The K and S project is the first commercial application of this process. Water injection was initiated on the and project in Feb., 1958, and CO2 injection started in April of the same year. The carbonation period should be completed by April 1, 1960. At this time it is too early to predict the ultimate oil recovery from the project. However, several notable accomplishments have been recorded to date. When the project was initially developed, several areas were noted to be highly water productive due to a previous dump flood. These areas subsequently have produced considerable oil, indicating that additional recovery has been gained. Second, injectivity has been increased to two to four times the rate of neighboring input wells which have not been subjected to the carbonated water process. And third, in 1959 more oil was produced than has been previously produced for the total primary life of the property. Introduction This paper is a progress report outlining the accomplishments and difficulties experienced to Jan. 1, 1960, at the K and S project. The K and S project is located 10 miles north of Bartlesville, Okla., and consists of three contiguous leases totaling 240 acres. There are 35 input wells and 24 producing wells spaced on a regular 10-acre five-spot pattern, as shown in Fig. 1. Water injection was initiated in Feb., 1958, and CO2 injection started in April of the same year. CO2 injection will be completed by April 1, 1960. Water injection will continue throughout the life of the project. The property was acquired in June, 1957. With 80 per cent of the working interest, Oil Recovery Corp. acts as engineering consultant and supervises the application of the process. Wellsville Oil Co., with the remaining 20 per cent of the working interest, is flood operator of the joint venture.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 32 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3