Drilling a Challenging Kvitebjørn Field 5¾-in. Section in a Single Run Using a New Mud Motor Modeling Engineering Workflow and New Long-Life Elastomer

Author:

Beeh Hany Ahmed1,Nobre Daniel1,Ba Samba1,Yan Xiaolu1,Lauritsen Åshild2,Døssland Ørjan2,Hodne Jarleif2

Affiliation:

1. Schlumberger

2. Statoil

Abstract

Abstract The challenging environment in the Kvitebjørn field offshore Norway comprises high-temperature wells, long drilling hours, low rate of penetration (ROP), managed pressure drilling (MPD), and mud additive requirements, all of which are very detrimental for operations and reliability of the positive displacement motor (PDM) power section. In fact, until now, no one has successfully drilled the 5 ¾-in. section in a single run due primarily to motor failures such as elastomer chunking and debonding. This paper presents the steps used for optimizing the selection of a PDM section to achieve a single-run drilling operation with improved ROP. The method includes understanding the drilling environment, type of wells, rig capabilities, formations, temperatures, MPD, and drilling fluid requirements. Furthermore, the usual motor and bottomhole assembly requirements must be evaluated and the mud compatibility with the elastomer must be scrutinized. All of these variables were then input into a modeling engineering workflow to simulate and analyze the power output, the elastomer fatigue life, the hysteresis heating, and the debonding stress to select the best possible PDM candidate for the drilling job. A new long-life elastomer and the drilling parameters recommended by the mud motor modeling resulted in drilling this section in a single run for the first time in the field. Simultaneously, it was possible to drill to the deepest total depth without any need to set the section total depth shallower, as occurred in previous wells due to motor failures. The motor drilled through a very thick cemented sandstone stringer with no stall incidents. This motor set new records for drilling the 5 ¾-in. section with a total run length 60% longer than the previous longest run and a total pumping time 67% greater than the previous record. The combined new technologies of the modeling and the new long-life elastomer were applied for the first time in the anticipated challenging drilling conditions. The successful results demonstrated that with thorough analysis and proper planning, one can achieve a step change in performance and reliability without additional costs. The scope of the operation is even broader than the mud motor application.

Publisher

SPE

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3