Streamlining Oil and Gas Operations Using Data-Driven Solids Management Services

Author:

Nilsson Olof1,Skåland Aksel1,Arefjord Anders1,Greenland Steve1

Affiliation:

1. FourPhase

Abstract

Abstract With approximately 70% of the world's petroleum located in poorly consolidated reservoirs, sand production is a global challenge. This paper explains a new well testing concept to optimise and maximise the production potential. This is achieved by finding the limit of topside sand production when the sand comes from the reservoir or is accumulated in the wellbore. If the sand comes from accumulation in the wellbore, it is removed by a cleanout operation (bottom-up) and measured by weight until the well stabilises on lower sand production to be confirmed coming from the reservoir. The next step will be to adjust the well flow to the acceptable sand rate (ASR) while still flowing at a rate not to accumulate sand in wellbore. This is difficult to achieve without proper sand measurement tools. A patent-pending well- testing method has been developed using Dual vessel desander solids management systems with regular well testing information. This method provides a complete picture of the sand production at the same time as the production potential of the well is discovered and realised. This is done while simultaneously reducing the effects of erosion from solids and without sand being transported to downstream process facilities. A dual vessel desander unit is installed during well testing to ensure sand protection for the downstream process facility. The system combines several data elements to measure solids production in real-time. The real-time data enables operators to tune wells individually for increased oil and gas production (Typically above the ASR production flow level). At the same time, ensuring produced solids are removed, measured and handled upstream of the process facility. The method shows several benefits; including improved guidelines for a well start-up (also often referred to as a well bean-up) to avoid sand to the surface, identifying unrealised production potential while maintaining solids below the ASR, and lowering overall sand production that enters the production separator by regularly cleaning wells with dual vessel desander systems. A case study from the North Sea is shared. An Operator utilised the method to reduce their coiled tubing cleanout operations due to continuous surveillance of sand producing wells that were brought into clean-up mode via the desander before they lost too much pressure and ceased production. ESG improvement over eight years, as the operator eliminated 20 coiled tubing clean-out operations, reducing operations cost, risks of heavy lifts, personnel mobilisations, and emissions per barrel produced.

Publisher

SPE

Reference11 articles.

1. Using Dual Desander and stackable Filter Unit for Cleanout after Concentric Coiled Tubing Operation;Arefjord,2017

2. Desouky, M. N.-A.-A.-S.-D. (1998). Factors Affecting Sand Production from Unconsolidated Sandstone. J. King Saud Univ. Vol. 11, Eng. Sci, (1) (A.H. 1419/1999), 151–174. Retrieved from https://reader.elsevier.com/reader/sd/pii/S1018363918309954?token=48A80C9D475F977EA9358DE33725535A9A80FE7EBCE03QZEgnbRqF5CqMK426TfQ4qz8VkMrdsWJG02990F6A4181F747CAFA&originRegion=eu-west-1&originCreation=20220215213410

3. DNVGL. (2015, August). DNVGL-RP-O501: Managing sand production and erosion. Retrieved from DNVGL: https://pdfslide.net/reader/f/dnvgl-rp-o501-managing-sand-production-and-erosion

4. FourPhase. (2021, 1215). 6000 bb/day production increase utilising a DualFlow. Retrieved from FourPhase.com/projects: https://www.fourphase.com/projects/gulf-of-mexico/

5. FourPhase. (2021, 1213). FourPhase. Retrieved from FourPhase technical content: https://www.fourphase.com/wp-content/uploads/2020/12/24062016_FourPhase_DualFlow.pdf

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3