Paradis CO2 Flood Gathering, Injection, and Production Systems

Author:

Bears D.A.1,Wied R.F.1,Martin A.D.1,Doyle R.P.1

Affiliation:

1. Texaco U.S.A.

Abstract

Summary Texaco U.S.A. has constructed a CO2 gathering and distribution system along with injection and production facilities for use in the Paradis field CO2 flood. The facilities were constructed concurrently and efficiently. They can be used readily for expansion of the injection into additional Paradis reservoirs. The systems have provided the operational reliability required for long-term projects. Modifications and maintenance have been minimal. The paper describes each system and discussesequipment and reasons for its selection andoperations history. Introduction CO2 injection began in Feb. 1982 in two reservoirs in the Paradis field, St. Charles Parish, LA (Fig. 1). However, the screening, planning, and design of the flood began in May 1979. The initial screening process to identify candidate reservoirs that were amenable to CO2 flooding required three months (Fig. 2). The reservoirs' producing histories and properties were reviewed and compared with guidelines for applying various EOR processes. Laboratory experimentation with reservoir fluid samples was begun. The planning and construction phases of project implementation required 30 months. The main objective of the planning phase was to determine the economic viability of the project. Estimates of equipment and operating cost were prepared. Actual bids for equipment and facility construction were received during project construction. The economics were updated as actual costs became available. Long-lead-time items for the various facilities, such as air emission permits, were applied for during the planning phase to avoid delays in construction. Frequent reviews of the project status were conducted to ensure that the project implementation went smoothly. Any commercial application of CO2 injection requires the securing of a long-term CO2 supply. The identification of such a source for the Paradis CO2 flood was conducted during the screening phase. The two sources were natural deposits in the Jackson Dome area of Mississippi and waste by product from industrial plants along the Mississippi River between Baton Rouge and New Orleans. The source selected was the by product from Monsanto Co. ammonia plants near Luling, LA. Equipment purchase and facilities construction did not begin until a purchase agreement was executed. CO2 Gathering System The CO2 gathering system consists of a gathering line, compression, dehydration, and metering facilities (Fig. 3). The system was constructed within the Monsanto Co.'s facility. Monsanto has two ammonia plants in operation that produce the CO2 as a waste by product. The flow data and an analysis of the gas produced by each plant are listed in Table 1. Plant 1 is 2,000 ft [610 m] from the compressor station site and Plant 2 is approximately 600 ft [183 m] away. To minimize Plant 2 is approximately 600 ft [183 m] away. To minimize the pressure drop, the gathering lines from each of the two plants are 24 in. [61 cm] in diameter. At the intersection plants are 24 in. [61 cm] in diameter. At the intersection of the two lines, the gathering line diameter increases to 30 in. [76 cm]. The gathering line is constructed of carbon steel pipe, which has the best structural attributes. Existing pipe supports and road crossings within the plant were used. pipe supports and road crossings within the plant were used. To protect the gathering line from the extremely corrosive wet CO2 and water that drops out in the line, the pipe was sandblasted internally and coated with an inorganic zinc primer and two epoxy top coats. The weld joints were primer and two epoxy top coats. The weld joints were wire-brushed and sealed with two brush-applied coats of coal tar epoxy. The piping system has not experienced any corrosion problems although it has only been in operation for a little problems although it has only been in operation for a little over 1 year. Stainless steel pipe was considered because of its corrosion resistance but was rejected because of its cost. Plastic pipe also was considered, but it is not structurally Plastic pipe also was considered, but it is not structurally strong enough for the required route through the plant. At the facility inlet, the saturated CO2 goes through a shell and tube inlet heat exchanger to cool the CO2 and knock out entrained water vapor. The heat exchanger was designed to provide a maximum temperature drop and be cost-efficient. It produces 30F [16.7C] temperature drop, which produces a corresponding drop in water content. From the heat exchanger, the CO2 passes to the inlet separator, which collects the water that falls out in the gathering line and heat exchanger. From the inlet separator, the CO2 goes to the suction manifold where it is picked up by the compressors. The suction pressure at the first stage cylinders on each unit is approximately 6 psig [41 kPa]. psig [41 kPa]. JPT p. 1312

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3