Pushing the ERD Envelope at Wytch Farm

Author:

Cocking D.A.1,Bezant P.N.1,Tooms P.J.1

Affiliation:

1. BP Exploration Operating Co. Ltd.

Abstract

Abstract BP Exploration, operator of the Wytch Farm Oil Field, has since April 1993 been developing the offshore extension of the Sherwood Reservoir using extended reach drilling (ERD) techniques. Over that time new drilling technology has become available, drilling strategies and methods modified, and many difficulties overcome. Wells are now being drilled to record breaking departures utilizing geosteering, casing floatation and torque reduction techniques. Horizontal reservoir sections in excess of 2.5km are being drilled, cased, successfully cemented and selectively perforated to boost accessible reserves. Increasingly, the conventional limits of directional drilling and completion are being pushed back. This paper will summarize the many ERD achievements to date at Wytch Farm. It will describe the technology, tools, techniques and strategies currently being applied to drill and complete the more recent extended reach wells in Western Europe's largest onshore oilfield. Introduction BP's Wytch Farm oilfield, located on the south coast of Britain, is currently being developed through the drilling of extended reach (ER) wells into the offshore part of the Sherwood sandstone reservoir. As has been well documented in previous papers, the development drilling of the offshore extension of the reservoir was originally planned to be accomplished from an artificial island to be constructed in Poole Bay. In December 1991, based on advances being made within the industry, this plan was abandoned in favour of extended reach drilling from the mainland. The cancellation of the Island project in favour of ERD assumed that 6km step-out wells could be drilled into the shallow (1,550m TVDss) Sherwood reservoir. In fact, 5 years on, over 8km step-out has been achieved, (Fig. 1). SPE paper no. 28293 referred to four Wytch Farm wells (F18 to F21) which attained a maximum step-out of 5.5km. This paper deals initially with experience on wells M1, M2, M3 and M5, each of which have reached ever increasing departures (Fig. 2). M5 attained a step-out of 8,035m, claiming the world record departure at any vertical depth. The paper also discusses wells M6 to M9 where new equipment and techniques were employed to improve ERD efficiency and provide the means to reach targets which exist at even greater departure in the near future. Trajectory Design The last three wells on F site had been drilled with a tangent of 80 – 82. This was continued on the M site wells, utilizing higher tangent angles as the departure increased. On M2 the tangent was increased to 830 to achieve the largest departure at that time of 6.7km. Through the build the maximum planned build rate was 2.5 /30m. The increasing tangent angle was minimizing torque during the drilling phase, but on M2 it became apparent that drag was becoming more of a limitation. The ability to slide a drillstring at depth was limited, and achievable reach with coiled tubing was being compromised. Comprehensive modeling indicated that the tangent angle should be reduced to 81 for M3 and M5 to improve sliding reach. This resulted in the build rate being increased to a maximum of 2.75 /30m on M5. This all appears like very fine tuning, but a 1 change in angle over a 5km tangent section does have a significant effect on ultimate torque and drag at 8.5km total depth. Once the reservoir was encountered, the inclination was immediately increased to 85 - 95 as required for the long geosteered 8 1/2" section. Drilling Operations Top Hole. Since moving to the newly constructed M-Site where near surface anti-collision problems were less severe, 24" hole was directionally drilled in one pass without the need for a pilot hole to 60 inclination by 220m. The 17.1/2" section attained 600 by casing point at circa 860m MDbrt. After running and cementing the 13.3/8" casing, the water based mud was displaced to oil based mud (OBM) before drilling the long,, 12.1/4" hole section. The build rate established in the 17.1/2 hole section was maintained at the start of the 12.1/4" hole section until the tangent angle of 800 to 830 was attained. 12.1/4" Hole Section. The length and tangent angle of the 12.1/4" hole section obviously depended on the step-out desired at the 9.5/8" shoe which was typically set at top reservoir. MS was drilled with an 81 12.1/4" hole section some 5,163m in length, 4,014m of which was drilled in one bit run. Steerable assemblies were used throughout, although the amount of sliding in the tangent section has with each well been steadily reduced to as little as 3%. Towards the end of the M5 12.1/4" section, an extended power section positive displacement motor (PDM) was run. P. 371^

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3