Abstract The collaborative approach used for cementing the production liner in an onshore development well in Russia is presented. The reservoir has a narrow window between pore and fracture pressures, which has previously caused formation instability and severe lost circulation issues during well construction, compromising zonal isolation objectives. Total loss of fluids experienced while cementing the 114.3 mm production liner in the first appraisal well in the field led to revising the cementing strategy. Collaboration among various parts of the drilling department and the opportunity to define a new approach resulted in a decision to introduce managed pressure drilling (MPD) to address the challenges associated with a narrow pressure window and uncertainty in pore pressure while drilling and cementing. This enabled implementing the optimal mud weight and adjusting equivalent circulating density (ECD) during cementing with minimum overbalance. Reducing the mud weight from 1.20 SG to 1.05 SG eliminated losses after running the liner and while cementing it. As a result, pre-job circulation rates and pumping rates during cementing could be increased, improving mud removal efficiency and achieving top of cement at the required depth. The constant-bottomhole-pressure mode of MPD was used to maintain the same ECD during displacement of the well to a lighter fluid and during cementing, avoiding well influx during pumpoff events by compensating for the annular friction pressure loss with surface backpressure. This first onshore managed pressure cementing operation executed within the same field in Russia (later named as field A) was completed flawlessly, with no safety or quality issues, zero nonproductive time, and achievement of the required zonal isolation across the challenging production section. The collaborative approach used was a novel strategy, with the mud weight program strategically adjusted before and during the cementing operation to achieve zonal isolation objectives.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3