Albacora Leste Field - Subsea Production- System Development

Author:

Bybee Karen1

Affiliation:

1. JPT Assistant Technology Editor

Abstract

This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper OTC 18044, "Albacora Leste Field - Subsea Production System Development," by C.E.C.V. Longo, S.J.A. Neto, and M.T.R. de Paula, Petrobras; F.M. Lopes Jr., Technip; and C.A.F. Godinho, SPE, Prysmian, prepared for the 2006 Offshore Technology Conference, Houston, 1–4 May. The Albacora Leste field-development plan comprises 30 horizontal wells tied back to a floating production, storage, and offloading (FPSO) platform moored by use of an innovative spread mooring system (SMS). All risers are flexible and installed in a free-hanging configuration. Environmental conditions and FPSO motion were factors in flexible-riser design. All flexible lines were anchored by means of torpedo piles. The full-length paper describes field development, including planning, design, qualification, manufacturing, and installation activities. Introduction The Albacora Leste field is in the deep north area of the Campos basin approximately 120 km off the coast of Brazil. Water depths in this field range from 800 to 2000 m, and oil densities range from 17 to 21°API. The field development comprises 30 horizontal wells (16 production wells and 14 injection wells, three of which are in a piggyback configuration) tied back to a host FPSO, P-50 by flexible risers and flowlines. Bending-stiffener and top riser accessories development and qualification represented an important and challenging success factor for the project. Three test benches were designed and assembled to perform the long-term fatigue tests for the gas-export flexible riser and to validate the new concept of the stiffener hanging systems. The FPSO will be moored in 1230 m of water by use of an innovative differential-compliance anchoring system. The oil, after treatment and storage on the FPSO, is pumped to a shuttle tanker. The produced gas then is cleaned and compressed, and a fraction of the total volume is used for power generation, gas lift, and internal consumption; the remaining volume is exported to shore by way of Platform PGP-1 in the Garoupa field, Campos basin. During the design phase, continuous gas lift and electrical-submersible-pump (ESP) artificial-lift methods were selected as potential candidates for the wells. However, at the time of the design phase, an ESP that could handle the high oil flow rates expected was not available, so the decision was made to use continuous gas lift as the artificial-lift method for the production wells. The approved gas lift design strategy eliminated pressure-operated valves and adopted a very simple and reliable well completion that included a single gas lift orifice valve. A high-discharge-pressure gas compressor was installed topside to guarantee continuous gas injection through the orifice valve at normal well-operation conditions and kickoff.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3