Pioneering Beetaloo Shale Appraisal: Case Study of Australia's Largest Multistage Fracturing Operation

Author:

Li H.1,Kalinin D.2,Bruce A.3,Bukovac T.1

Affiliation:

1. SLB, Brisbane, QLD, Australia

2. inGauge Energy, Brisbane, QLD, Australia

3. Empire Energy Group Limited, Sydney, NSW, Australia

Abstract

Abstract In the Beetaloo Sub-basin within the Northern Territory, Australia, the shales of the Velkerri and Kyalla Formation are highly prospective. The Carpentaria-3H well was drilled in the B Shale of the Amungee Member of the Velkerri Formation with a lateral length of more than 2,632 metres and completed over a 1,989-metre section. Beyond the appraisal nature of work, the observation of natural fractures and faulting coupled with geomechanical complexity posed multiple challenges to the planning, design, execution, and evaluation of Australia's largest stimulation job to date. This paper provides a comprehensive review of the Carpentaria-3H fracturing design and operation, following incorporating data from the Carpentaria-2H well. Completion design included developing the fracture stage interval spacing, number of clusters per stage, and cluster perforation density. For the fracturing treatment, decisions were refined for selection of fluid and proppant type, job volume optimisation and differentiation. Design optimisation is based upon both the simulator and evaluation measurements from the Carpentaria-2H reference well. Furthermore, observations from field execution, including formation response, experimental fracturing stages, and onsite design optimization, were incorporated. The largest multi-stage fracturing operation to date in Australia was completed with 12.8 million pounds of sand and proppant successfully placed without screen out across 40 stages. Across the multiple stages trials of sleeve-perforation comparison, out-of-target stages, variable sand size and ceramic proppant were successfully executed. During post-fracturing cleanup, the Carpentaria-3H produced at an average rate of 2.6 MMscf/D over 27 days prior to being shut-in for a period of "soaking". The success of the well completion through a multi-stage fracturing operation marked a breakthrough in Beetaloo Sub-basin appraisal and demonstrated that long lateral drilling and large-scale fracturing treatments can be a viable pathway to improve efficiency and return on investment. This is despite the limitations imposed by scarce infrastructure and challenging logistics in the Australian outback. Knowledge from the evaluation work undertaken in the previously stimulated and tested Carpentaria-2H wells was critical to advancing the Carpentaria-3H project. The Carpentaria-2H well's multi-arm calliper measurements offered enough precision to evaluate the perforation erosion following proppant placement. This generated a new technique for indirect evaluation of fluid and proppant distribution among the clusters. Production logging and chemical tracers also provided useful information for calibration and design optimization. Furthermore, advanced software tools were applied to integrate reservoir modelling, fracture and reservoir simulation, and data analysis.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3