Thermoplastic Lined Tubing: A Cost-Effective and Uptime-Enhancing Solution to Prolong Well Run Life

Author:

Alisaee M. K.1,Al Hinai M. I.1,Al-Mandhari S.1,Al Riyami S. Y.1,Al Saadi F.1,Alhinai G.1,Al Busaidi I. K.1,Al Harthy A. H.1,Al Masfry R.2,Al Suleimani A.2,Al Riyami H.2

Affiliation:

1. Petroleum Development Oman

2. Marjan Petroleum

Abstract

Abstract Production deferment and its associated costs are one of the key challenges in Well Reservoir Formation Management (WRFM) environment especially as wells are aging and frequently failing prior to their expected well life span. This could happen due to various reasons and one of them is the tubing erosion/corrosion in artificially lifted wells such as PCP and ESP. Therefore, the idea of installing thermoplastic lined tubing came up as an attempt to prolong the completion run life and thus reduce oil deferment along with CAPEX and OPEX. Fields in South of Oman operate at harsh reservoir conditions. Wells are producing relatively heavy oil at high BSW and high sand content. In 2020, hoist intervened 31 times in two fields (A and B) with a total of 70 active PCP wells only. 74% of failures were attributed to hole in tubing and 60% of these had less than one year run life. These alarming statistics necessitated out-of-the-box thinking. Thermoplastic lined tubing came into a picture as a mean of reducing failures by minimizing the friction between tubing and pump rods. This new method was first piloted in PDO in four wells in field A. Despite being installed for over two years, none of the wells in pilot have failed till to date. Completion run life has increased by double and nearly triple in some cases and wells are still continuously operating successfully. This is a great achievement when it comes to deferment and cost reduction. In field A & B, each hoist intervention cost $100-150k, and deferment might last for 20-40 days before well restoration take place. Preliminary results showed a saving of three interventions per well within two years and an increase of well uptime. The successful results extended the current plan to full deployment that will include other artificial lift well types. Furthermore, more than 30 thermoplastics lined tubing installations are currently expected per year in different fields for different clusters in PDO. Thermoplastic lined tubing has not only proven to increase completion run life but also improve workovers cost and has element of energy saving due to reducing friction loss between pump rods and the internal of the tubing. This means less pump torque and less power consumption to lift the fluid to surface with an estimated power saving of 7-10%.

Publisher

SPE

Reference12 articles.

1. Abrasion resistance of oil well tubing material;Ali;Journal of Petroleum Exploration and Production Technology,2013

2. Experimental investigation of cavitation wear in oilfield tubulars;Hasan;Wear,2018

3. Corrosion in oil and gas industry: an inevitable and costly reality;Kermani;Materials and Corrosion,2003

4. Fatigue damage behavior of oil well tubing steel under different corrosive environments;Piao;Engineering Failure Analysis,2019

5. Erosion wear of carbon steel in multiphase flow;Wang;Wear,2016

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3